Circuit Card Installation
6-9
3000-A2-GA31-D0
July 1999
To install the ferrite choke on the DTE interface,
network, or power cable:
"
Procedure
1. Pull up on the latch to open the ferrite choke.
2. Place the ferrite choke around the cable as close to
the cable connector as possible.
3. Close the two halves around the cable and snap
the ferrite choke shut.
4. Press down on the plastic latch to secure the ferrite
choke in place around the cable.
5. For the ac power cable or other thin cable, secure
the ferrite choke in place with a cable tie wrap.
496-14820-01
Ferrite Choke
Tie
Wrap
Plastic
Latch
Refer to Figure 6-10 for examples of installed ferrite
chokes.
99-15235-02
P
O
RT 1
P
O
RT 2
P
O
RT 3
P
O
RT 4
P
O
RT 5
P
O
RT 6
Ferrite
Choke
Cable
Tie Wrap
for AC
Power Cable
Ferrite Choke for
V.32 DBM
or DBM-V
V.35
Cable
6-Port
MUX
Adapter
NIM
EIA-232
Interface
3600
V.35
Interface
Network Cable
DTE
Connector
Figure 6-10. Examples of Installed Ferrite Chokes, Carrier Rear View
Summary of Contents for Compshere 3000 Series
Page 1: ...COMSPHERE 3000 SERIES CARRIER INSTALLATION MANUAL Document No 3000 A2 GA31 D0 July 1999 ...
Page 10: ...COMSPHERE 3000 Series Carrier iv July 1999 3000 A2 GA31 D0 This page intentionally left blank ...
Page 12: ...COMSPHERE 3000 Series Carrier vi July 1999 3000 A2 GA31 D0 ...
Page 52: ...COMSPHERE 3000 Series Carrier 5 8 July 1999 3000 A2 GA31 D0 ...