![Paradyne 3162 User Manual Download Page 43](http://html.mh-extra.com/html/paradyne/3162/3162_user-manual_753681043.webp)
4-1
3162-A2-GB20-40
August 2000
Configuration
4
Overview
Configuring the DSU/CSU may include:
H
Setting Customer Identification
H
Configuring the 10BaseT Port
H
Configuring the COM Port for SNMP or Telnet Access
H
Configuring DS0 Channels
H
Establishing Access Security on the COM Port
H
Setting a Password
H
Entering a Password to Gain Access
H
Selecting the Timing Source
H
Providing Backup Capability
Summary of Contents for 3162
Page 1: ...ACCULINK 3162 DSU CSU USER S GUIDE Document No 3162 A2 GB20 40 August 2000 ...
Page 12: ...Contents vi 3162 A2 GB20 40 August 2000 This page intentionally left blank ...
Page 16: ...About This Guide x 3162 A2 GB20 40 August 2000 This page intentionally left blank ...
Page 42: ...Operation 3 16 3162 A2 GB20 40 August 2000 This page intentionally left blank ...
Page 64: ...Configuration 4 22 3162 A2 GB20 40 August 2000 This page intentionally left blank ...
Page 94: ...Monitoring and Testing 5 30 3162 A2 GB20 40 August 2000 This page intentionally left blank ...
Page 186: ...Equipment List G 2 3162 A2 GB20 40 August 2000 This page intentionally left blank ...