![Paradyne 3162 User Manual Download Page 28](http://html.mh-extra.com/html/paradyne/3162/3162_user-manual_753681028.webp)
Operation
3-2
3162-A2-GB20-40
August 2000
Table 3-1.
System LEDs
Name
Color
Meaning
OK
Green
Indicates the current operational state of the DSU/CSU.
ON :
The DSU/CSU is operational and has power.
OFF :
The DSU/CSU is performing a power-on self-test
or a system failure has occurred.
BLINKING : A software download is in progress.
FAIL
Yellow
Indicates a system failure or a self-test.
ON :
A device error/fault is detected or a reset has just
occurred.
OFF :
No system failures are detected.
BLINKING: A self-test is in progress.
TEST
Yellow
A system test is in progress.
ON :
A loopback or pattern test has been initiated
either locally, by the network, or externally.
OFF :
No tests are active.
Table 3-2.
Network Interface LEDs
Name
Color
Meaning
SIG
Green
Monitors the signal being received from the network.
ON :
A recoverable signal is being received from the
network.
OFF :
The signal cannot be recovered from the network
(a Loss of Signal condition exists).
OOF
Yellow
Monitors Out Of Frame (OOF) conditions on the received network
signal.
ON :
At least one OOF was detected on the signal during the
sampling period.
OFF :
No OOFs were detected on the signal during the
sampling period.
ALRM
Yellow
Indicates whether an alarm condition exists on the received network
signal.
ON :
An alarm condition (LOS, LOF, EER, Yellow, AIS)
exists on the received network signal. Use the System
and Test Status screen to determine the alarm type.
OFF :
No alarm condition exists on the network interface
signal.
EER
Yellow
Indicates the Excessive Error Rate (EER) has been exceeded on the
network interface.
NOTE: This LED is only valid when ESF framing is being used.
ON :
The EER has been exceeded on the network
interface.
OFF :
The EER has not been exceeded on the network
interface.
Summary of Contents for 3162
Page 1: ...ACCULINK 3162 DSU CSU USER S GUIDE Document No 3162 A2 GB20 40 August 2000 ...
Page 12: ...Contents vi 3162 A2 GB20 40 August 2000 This page intentionally left blank ...
Page 16: ...About This Guide x 3162 A2 GB20 40 August 2000 This page intentionally left blank ...
Page 42: ...Operation 3 16 3162 A2 GB20 40 August 2000 This page intentionally left blank ...
Page 64: ...Configuration 4 22 3162 A2 GB20 40 August 2000 This page intentionally left blank ...
Page 94: ...Monitoring and Testing 5 30 3162 A2 GB20 40 August 2000 This page intentionally left blank ...
Page 186: ...Equipment List G 2 3162 A2 GB20 40 August 2000 This page intentionally left blank ...