33
STEP 36
FIGURE 36
• To assemble the LAT CABLE (99) follow the cable routing as shown and use the following steps:
•
Remove the two bolts in the FRONT UPRIGHT (25) and TOP BOOM (17) connection.
•
Route the LAT CABLE (99) as shown in FIGURE 33.
(Remove pulleys for ease of installation.)
•
Run the LAT CABLE (99) through one of the holes in the D-RING (7) and attach one KEYHOLE CLEVIS (66) to the end of the LAT
CABLE (99). See FIGURE 36 .
•
Replace and
SECURELY
tighen the FRONT UPRIGHT (25) and TOP BOOM (17) connection and any pulleys from the previous
step.
(NOTE: Make sure the LAT CABLE runs over the top of the bolts in the top boom.)
NOTE: REMOVE BOLTS FOR
CABLE INSTALLATION
25
17
99
7
WEIGHT
STACK
CABLE
66
99
102