32
0
1
2
3
4
5
6
1/2
1/2
1/2
1/2
1/2
1/2
FIGURE 35
STEP 35
• To assemble the D-RING CABLE (102) follow the cable routing as shown and use the following steps:
•
Screw one of the threaded ends of the D-RING CABLE (102) approximately 1” into the end of the SELECTOR SHAFT (73) of the HEAD
PLATE (72) as shown in FIGURE 35.
•
Route the CABLE (102) up and over the two PULLEYS in the TOP BOOM (17) above the WEIGHT STACK.
(Remove pulleys
for ease of installation.)
•
Screw the other threaded end of the D-RING CABLE (102) approximately 1” into the end of the shaft on the D-RING (7) as shown in
FIGURE 35.
•
SECURELY
tighten two pulley connections from the previous step.
17
72
73
7
102