3-6. Wiring type and length
3
Wiring
Wiring run
Wire diameter
Max. length
Control box
<-->
Lobby station
0.65 mm (22 AWG)
approx. 100 m
1.2 mm (17 AWG)
approx. 200 m
Control box
<-->
Distribution mode
the farthest distribution box
0.65 mm (22 AWG)
approx. 100 m
1.2 mm (17 AWG)
approx. 200 m
Control box
<-->
Repeater mode
the distribution box that is
operating
as a repeater
0.65 mm (22 AWG)
approx. 100 m
1.2 mm (17 AWG)
approx. 200 m
Repeater mode
the distribution box
that is operating
as a repeater
<-->
Distribution mode
the farthest distribution box
0.65 mm (22 AWG)
approx. 100 m
1.2 mm (17 AWG)
approx. 200 m
Distribution box
<-->
Main monitor
0.65 mm (22 AWG)
approx. 100 m
1.2 mm (17 AWG)
approx. 200 m
Control box
<-->
The farthest lift controller
0.65 mm (22 AWG)
approx. 100 m
1.2 mm (17 AWG)
approx. 200 m
Power supply unit
<-->
Lobby station
Control box
Distribution box
Lift controller
0.65 mm (22 AWG)
approx. 10 m
2 mm (12 AWG)
approx. 20 m
Power supply unit
<-->
AC power source
1.2 mm (17 AWG)
No requirement
2 mm (12 AWG)
Lobby station
<-->
Electric lock
0.5 mm (24 AWG)
According to specification of
connected device.
1.2 mm (17 AWG)
- Use 2-conductor (solid copper) wiring with a PE (polyethylene)-insulated PVC jacket.
Mid-capacitance, non-shielded cable is recommended.
- A certified power supply wiring has to be used with this equipment. The relevant national installation and/or
equipment regulations shall be considered. A certified power supply wiring not lighter than ordinary polyvinyl
chloride flexible wiring according to IEC 60227 shall be used.
- When connecting an electric lock to the electric lock connection terminal (K-OUT), select a device that meets the following
guidelines.
– N/C or N/O dry closure contact
– 12 V AC/DC, less than 1 A
32
Summary of Contents for VL-MV26
Page 1: ...2016 Video Intercom INSTALLATION GUIDE ...
Page 4: ...Why Choose a Panasonic Video Intercom System 1 ...
Page 6: ...Role Features Installation 1 2 ...
Page 27: ...Wiring 3 ...
Page 45: ...Integration 4 ...
Page 57: ...Setup Tool 5 ...
Page 78: ...Operation 6 ...
Page 81: ...Replace 7 ...
Page 88: ...Estimate 8 ...
Page 104: ...How to support the villa complex 8 Estimate 97 ...
Page 108: ...FAQ 9 ...
Page 109: ...Appendix 10 ...
Page 121: ......