background image

ー 17 ー

ー 18 ー

After checking the above construction, to 
determine the insulation resistance.
Working voltage 300V or less
150V or less voltage to ground: Longer than 0.1MΩ
150V or higher voltage to ground: Longer than 0.2MΩ
Working voltage 300V or higher, than 0.4MΩ

Make a tightening of the connection terminals

Is not there any mistake in the contact terminal 
position (R, S, T, E, and signal connection line) of a lead? 

Adjust its mounting dimension.

Is the center of a duct and the collector  
arm on a straight line? 
 Installation Tolerance: ± 3mm center"

Do not cover broken or damaged signal wires?

Retighten.

Are there any terminal screws or thefixed 
screws loosen?

If there is damage, replace the collector shoes.

Is there any damage on the sheath of lead wire?

Replace if chip or broken spring pin is found.

Is there any chip or broken?

If the collector shoes pulled, correct to 
have extra length on lead wire.

Is the collector shoes pulled by the lead wire?

Remove the protrusion (convex) on thearc scratch using a file.

Is there any ark generated protrusion ?

If the motion is not smooth, replace the 
current collector and the collector arm.

Does  the collector move smoothly? 

Adjust the collector arms mounting dimensions.

Is there  wear of plastic part  of  the collector plastic part? 

Remove it with sandpaper or wes.

Are there  significant contamination,foreign 
matter adhering , occurred burr in collector?

Replace the arm if there is curve or variation.

Is there any curve or variation on the arm?

Collector shoes should be replaced

when they partially wear down to the

replacement indication line.

Please exchange the collector shoes ahead 

of time when it will be worn out

to the replacement indication line by the time 

of the next check.

by the time of the next check.

Is there any serious wear to replacement 
indication line
Is there any serious wear to replacement 
indication line? or,Does exceed a travel 
distance of 20,000 km?

Mount the collector arm in parallel with 
the duct. 

Is the collector arm attached in parallel 
with a duct, so that it cannot twist?

Adjust the collector arm in the reference value.

Is the arm installing dimension correct?
Single-type (for mounting rod ), tandem-type
 (for mounting rod ) 
The length of to the center of themounting 
rod from the sliding surface 
(movable range): 65±10mm
tandem-type (for mounting plate ) 
The length of to themounting plate from 
the sliding surface
(movable range): 65±10mm
Single-type (for mounting plate )
The length of to the center of themounting 
plate from the sliding surface 
(movable range): 60±10mm

Adjust the position of Hunger.

Are hanger located within 100 mm from 
side to side insulating piece?

Adjust its mounting dimension.

Are correct  cutting  size of the duct or the duct end ?
 The duct cutting Size:  The length of the 
 duct (standard length  L) -17.5 mm  .

・Cutting Size of the duct end :Remove the 

 insulating sheath 17.5mm from the 
 edge of the duct,

Replace if cracked or broken sheath is found.

Is there any cracked or broken on plastic section?

Retighten.

Is there any fixed screw loosen?

Adjust its mounting dimension.

Gap between the guide cap size correct?

・10〜20 mm

Adjust it within specified dimension.

Are  correct  clearance size of between the guide cap ?
Is the gap between the guide cap size correct?

・Guide cap mutual clearance: 10 〜 20mm

Horizontal: Max 2mm
 Vertical: Max 2mm
Please have the above range, even when 
loaded to rated load on the trolley at any time.

Guide cap

Insulating piece

Collector arm

uni

t

Inspection cycle (standard)

Measures

Result

Remedy

Contents of inspection

Name

Distance of 
the collector 
arm :3000km

the number of 
passes through 
the collector's
arm:1,000,000

the number of 
passes through 
the collector's
arm:1,000,000

Check the amount of wear of the collector and 
conductor of the duct, replace it if necessary.

Don't the insulated sheath and the resin part of collector
 spinning shaft  touch?

Please exchange, when the amount of wear 
of a guide cap resin part is 0.5 mm or more. 

Amount of wear of the plastic is correct? 
Amount of wear of the plastic :0.5 mm or less
Exchange of a guide is when the conductor sliding 
surfaces will become taller than the guide-cap sliding surfaces, 
the number of times of passage of the collector is 5 million times. 

When damage and crack occurred in the fixedend 
insulator, please change it.

Are not there the cracks and damaged on 
aplastic part?

Insert the duct to ensure.

Are  insert the conductor and sheath of a duct certainly? 

Adjust it within specified size.

Are correct  cutting  size of the duct or the duct  end ?
• The duct cutting Size:  size  of between Joiner (L)   -3mm 
※ The same is the case of  the  Center Feed-in  Joiner .

・Cutting Size of the duct end :Remove the insulating 

sheath 27.5mm from the edge of the  duct,

Retighten.

Is there any fixed screw loosen?

Retighten.

Is there any fixed screw loosen?

Adjust it within specified size.

 Are  correct  joiner mounting size?

・Or less · 10 ℃: 3003 mm

 · 11 ℃ ˜ 40 ℃: 3000 mm

Adjust to the proper pitch

Did you set up the correct size and 
mounting hangers?

・Straight sections: Max 600 mm 
・Curved section  : Max 500 mm

Adjust the proper clearance size.

・Adjust the length of the duct, or Aalign the joiner.
・Adjust the mounting position of  the hangers.

Are  correct  clearance size of between 
 the conductors ?

・Or less · 10 ℃: 5 〜13 mm
・11 ℃ ˜ 40 ℃: 3 〜10 mm

When damage and crack occurred in the fixed 
end insulator, please change it.

Are not there the cracks and damaged on a 
plastic part?

If it exceeds a threshold amount of wear, please 
replace the main conductor In case of wearing 
down to the replacement indication line at next
inspection, please replace earlier than usual.

Amount of wear of the conductor is correct? 
Amount of wear of the conductor :0.7 mm or less

If whiskers (Bali) occurs , remove by using 
the  conductor cleaner.

Are there occurred whiskers(Bali) of conductors ?  

Review for any dislocated position on the 
unit. Correct if any.

Isn t the unit dislocated from the hanger?

Correct the twisting or bending of the duct.
※ If you can not fix,  replace the duct.

Is there a significant twisting or bending of the duct?

Adjust it within specified size.

・Adjust the length of the duct, or Aalign the joiner.
・Adjust the mounting position of  the hangers.

What is the meander of the duct or swell in 
the regulations?
The serpentine tolerance: standard ± 5 mm
Tolerance of modulation ·: standard ± 3mm 

If the tip of the sheath thickness is 1.2mm 
or less, please replace insulation

Is there damage and crack at the insulating
sheath ?

Remove any protrusion (convex) on the arc

scratch using a file.

※ If you can not fix, please replace the duct. 

    scratch using a file.

Is there any ark generated protrusion
(convex shaped) on its sliding surface? 

Clean with a specific purpose cleaner
or waste cloth.

Check to see if there is any foreign
particles adhering on its sliding surface
or if it is seriously contaminated.

Inspection cycle (standard)

Measures

Result

Remedy

Contents of inspection

Name

○:Exchange required

Measures

●:Finished with exchange
△:Adjustment required
▲:Finished with adjustment

Result

○:Normal

×:Abnormality

A  title

Check day

  Y       D       M

The check 

person in charge

 

 Inspections item at the time of the pre-use test run(Checking at periodic inspection).

 

 For using safely, please inspect the system one month after starting regular 

operation.

 

 The inspection cycle is mentioned below. However, determine your own 

inspection cycle based on the actual operating rate and environmental condition.

 

 Items in bold: Inspection items requiring particular attention.

Notes

To Maintenance manager

Tro-Reel unit

Joiner( Center feed-in joiner)

Hanger

Guide cap

Maintenance

Trial run

Periodic inspection

the number of 
passes through 
the collector's
arm:1,000,000

Summary of Contents for Tro-Reel HS

Page 1: ...ic shock fire or damage due to falling of equipment may occur Do not use where exposure occurs Otherwise electric shock fire or damage due to falling of equipment may occur Use at ambient temperature 10 40 If you use outside this temperature range please contact Panasonic Corporation If any abnormalities occur turn off the power immediately and contact a qualified electrician for inspection and re...

Page 2: ...だ さ い 本体の導体及びシースは確実に挿入さ れて いるか 適正な寸法に修正 して く だ さ い 本体の切断および端末加工寸法は適正か 本体切断寸法 ジ ョ イナ間寸法 中心寸法 Lに対 し L 3mm センターフ ィ ー ドイ ンジ ョ イナ部も同様 端末加工寸法 導体端面か ら27 5mm 絶縁シース を取り除く 増 し締め して く だ さ い 固定ね じのゆるみはないか 破損 クラ ッ クのある場合は交換 して く だ さ い ハンガーの割れ クラ ッ クはないか 増 し締め して く だ さ い 固定ね じのゆるみはないか 適正な寸法に調整 して く だ さ い ジ ョ イナの取付寸法は適正か 10 以下 3003mm 11 40 3000mm 適正な取り付けピッ チに修正 して く だ さ い ハンガーの取付ピ ッ チは正 し く セ ッ ト さ れているか 直線部 600...

Page 3: ... さ い 本体の切断および端末加工寸法は適正か 本体切断寸法 本体長さL 基準寸法 に 対 し L 17 5mm 端末加工寸法 導体端面か ら17 5mm 絶縁シース を取り除く 破損 クラ ッ クのある場合は交換 して く だ さ い 樹脂部に破損 クラ ッ クはないか 増 し締め して く だ さ い 固定ね じのゆるみはないか 適正なすき間寸法に調整 して く だ さ い ガイ ドキ ャ ッ プ間のすき間寸法は適正か 10 20mm 公差内寸法に修正 して く だ さ い ガイ ドキ ャ ッ プ相互の取付寸法は公差内か ガイ ドキ ャ ッ プ相互の隙間 10 20mm 水平方向 2mm以下 垂直方向 2mm以下 台車への荷物積載時及び無負荷 荷物 な し 状態において上記寸法以内である 点検周期 目安 処置 結果 試運転 処置 対策 点検内容 名称 集電アーム 通過回数 100万回 ...

Page 4: ...取り付けピッチ 本体の熱伸縮を吸収するためにジョイナ センターフィー ド インジョイナ は下表の寸法で取り付けてください 接触不良 集電アームの脱線などのおそれがあり ます 本体長さは2997 2mmです 敷設時の周囲温度 取り付け寸法 L 接続部の導体間寸法 10 以下 3003 5 13 11 40 3000 3 10 曲がり部での接続はさ けてください ジョイ ナ間に本体を取り付け る時 本体を湾曲させ る必要があり 内曲が りの場合は 直線部分 がとれる様 曲がり部 の中心にジョイナを設 けると曲がり部での接 続が可能です ご注意 ご注意 ジョイナの取り付け ジョイナ ハンガーの取り付けピッチ ジョイナ センターフィードインジョイナ の取付穴寸法 ハンガーの取り付け 本体をハンガーに取り付ける 1 3 4 2 1 2 2 150 130 15 49 5 5 10長穴 150 130...

Page 5: ...10 6 9 60 90 メーカ 品 番 ねじ締付トルクN m kgf cm UL 規格品として使用する場合には 給電用ボックス及び給電ケーブル用 端子台に制限があります その内容は以下の通りです 1 給電用ボックス UL50 Enclosure For Electrical Equipment に準拠している仕様であること 下表の端子台であること 30 60 90 45 75 105 3P 4P 5P 6P 7P 8P 3P 4P 5P 6P 7P 8P 3 本 3 本 3 本 3 本 3 本 3 本 AWG4 22mm2 8mm2 AWG8 ー 1 本 2 本 3 本 4 本 5 本 給電ケーブル本数 給電ケーブルの長さは500mmです 3 3 3 3 信号線が不要な場合は電線の端末をビニールテープで絶縁し 集電アームの走行に支障がないよう固定してください 1 金ノコで切断するときは ...

Page 6: ...てください トロリールHSの導体上面から集電アームの取付板表面まで 60mm 集電アームの許容可動範囲 60 10mm の中心値 としてくだ さい 本体の中心と集電アームの中心は 3mm以内に取り付けてください 1 各部の取付寸法を確実に守って取り付けてください 設備稼働中は集電アームを 65 10mm シングル型 サドルなし の場合は 60 10mm の許容範囲内で使用してください 接触不良 集電アームの脱線などのおそれがあります 2 集電アームの取り付けは 15mmピッチとし 密着させて取り付けてください シングル型 サドルなし は除く 接触不良 集電アームの脱線などのおそれがあります 3 集電アームは本体と平行に またねじれないように取り付けてください 接触不良 集電アームの脱線などのおそれがあります 4 トロリール HS 本体の中心と集電アームの中心が 3mm以内に取り付けられてい...

Page 7: ...do so may cause fire due to sparks poor collector arm contactor separation from wires Conductor cleaner Tro Reel HS unit Conductor cleaner mount rod 12 12 not included 11 1 Mount the supporting parts of collector arm on saddle 2 Set the distance from the upper surface of the Tro Reel HS conductor to the center of collector cleaner mount rod to 65mm Central value of the collector cleaner permitted ...

Page 8: ...part and 8 mm awayfrom the edge of the mount plate Tro Reel HS unit Upper surface of the conductor Screw M5 Upper surface of the conductor Tro Reel HS unit Tro Reel HS unit Screw M5 Permittedmovablerange 19 13 15mm 15mm 8mm Collector arm 60 10mm Upper surface of the conductor 60 10 Collector arm support parts permitted movable range of collector arm Shaft Collector arm Cable tie Cable tie 120mm Co...

Page 9: ...les in the rail See 2 2 Joiner mount holed imensions 2 Screw the center feed in joiner to the rail in line with the center mark 1 Line up the Tro Reel HS unit between the center points of the two joiners central dimension L and cut 3mm off of one end being careful not to cut the conductor 2 Mark the length to be cut off on the Tro Reel HS unit as shown below and remove the insulating sheath using ...

Page 10: ...angers on curved sections Hanger installation MountingtheTro ReelHSunitontothehangers Nut washer spring washer not included Gap between screws two M5 screws 8mm thread depth Insert a flat tip screwdriver into the hanger slit Then lift the upper holder upward while pulling the lower holder down Removing the Tro Reel HS unit Joiner Rail Joiner Joiner O v e r R 8 0 0 m m Tro Reel HS unit 1 Drill hole...

Page 11: ... of wear of the collector and conductor of the duct replace it if necessary Don t the insulated sheath and the resin part of collector spinning shaft touch Please exchange when the amount of wear of a guide cap resin part is 0 5 mm or more Amount of wear of the plastic is correct Amount of wear of the plastic 0 5 mm or less Exchange of a guide is when the conductor sliding surfaces will become tal...

Page 12: ... using file after cutting drilling Observe may cause injury to your fingers Use products only within the specified rating and load capacity Violation of specified ranges may cause burning or fire Firmly fix this product to the material of construction and construct it Otherwise fire or damage due to falling of equipment may occur Construct the material of construction that installs the product fir...

Reviews: