Installation and Settings
WUME-SCHG1C-4
3-10
3-3-5 Procedure for connecting the CC-Link connector
For the communication cable, use a CC-Link dedicated cable (shielded, 3-conductor, twisted pair
cable).
■
Communication cable work procedure
1.
Strip off the jacket on the dedicated cable as shown below. When stripping off the jacket,
take care not to damage the shield braid inside the dedicated cable.
Outer jacket of dedicated cable
Shield braid
Approx. 50mm
2.
Carefully unbraid the shield braid.
3.
Firmly twist together the shield and the stranded wire inside the shield braid.
4.
Cover the twisted shield wires with insulating tubing (obtain separately).
Insulating tube
(Obtain separately)
Shield braid
5.
Strip off the stranded wire (lead wire) jackets as shown below.
Stranded wire (lead wire)
Approx. 3mm
6.
Attach ferrule (sleeve) terminals (obtain separately) to the stranded wire (lead wire) and
shield wire.
Stranded wire (lead wire)
Ferrule (sleeve) terminal
(Obtain separately)
Summary of Contents for SC-HG1-C
Page 2: ...WUME SCHG1C 4 2 MEMO ...
Page 8: ...WUME SCHG1C 4 8 MEMO ...
Page 16: ...WUME SCHG1C 4 1 8 MEMO ...
Page 17: ...2 1 2 System Configuration 2 1 Communication unit system 2 2 2 2 Unit types 2 4 ...
Page 22: ...WUME SCHG1C 4 2 6 MEMO ...
Page 106: ...WUME SCHG1C 4 4 72 MEMO ...
Page 107: ...5 1 5 Specifications 5 1 Specifications 5 2 5 2 Dimensions 5 3 ...
Page 110: ...WUME SCHG1C 4 5 4 MEMO ...
Page 111: ...6 1 6 Warranty 6 1 When you purchase and use the product 6 2 ...
Page 114: ...WUME SCHG1C 4 6 4 MEMO ...
Page 124: ...WUME SCHG1C 4 8 8 MEMO ...
Page 126: ... MEMO ...
Page 127: ... MEMO ...