![Panasonic S-71WF3E Service Manual Download Page 73](http://html.mh-extra.com/html/panasonic/s-71wf3e/s-71wf3e_service-manual_1507724073.webp)
73
11.3.1.1.2 Examples of Installations
Floor heating 1 + Floor heating 2
Outdoor
Room Thermostat
(field supply)
Thermistor 2
Thermistor 1
Buffer tank
Pump 2
Pump 1
Mixing valve 2
Mixing valve 1
Indoor
Floor heating 2
Floor heating 1
Setting of remote controller
Installer setting
System setup
Optional PCB connectivity - Yes
Zone and Sensor - 2 Zone system
Zone 1:Sensor
Room thermostat
Internal
Zone 2:Sensor
Room
Room thermostat
(External)
Connect floor heating to 2 circuits through buffer tank as shown in the figure.
Install mixing valves, pumps and thermistors (specified by Panasonic) on both circuits.
Remove remote controller from Tank Unit, install it in one of the circuit and use it as Room Thermostat.
Install external Room Thermostat (field supply) in another circuit.
Both circuits can set circulation water temperature independently.
Install buffer tank thermistor on buffer tank.
It requires connection setting of buffer tank and ΔT temperature setting at heating operation separately.
This system requires Optional PCB (CZ-NS4P).
Floor h Radiator
Outdoor
Radiator
Thermistor 1
Thermistor 2
Buffer tank
Pump 2
Pump 1
Mixing valve 1
Indoor
Floor heating
Setting of remote controller
Installer setting
System setup
Optional PCB connectivity - Yes
Zone and Sensor - 2 Zone system
Zone 1:Sensor
Water temperature
Zone 2:Sensor
Room
Water temperature
Connect floor heating or radiator to 2 circuits through buffer tank as shown in figure.
Install pumps and thermistors (specified by Panasonic) on both circuits.
Install mixing valve in the circuit with lower temperature among the 2 circuits.
(Generally, if install floor heating and radiator circuit at 2 zones, install mixing valve in floor heating circuit.)
Remote controller is installed on Tank Unit.
For temperature setting, select circulation water temperature for both circuits.
Both circuits can set circulation water temperature independently.
Install buffer tank thermistor on buffer tank.
It requires connection setting of buffer tank and ΔT temperature setting at heating operation separately.
This system requires the Optional PCB (CZ-NS4P).
Mind that if there is no mixing valve at the secondary side, the circulation water temperature may get higher than
setting temperature.