2.8.2 Procedure Overview
When connecting the wireless system, use extreme care in conducting the site survey. An incorrectly performed
site survey can result in poor service area, frequent noise, and disconnection of calls.
1. Investigate the installation site
Refer to "2.8.3 Site Planning".
a.
Obtain a map of the CS installation site.
b.
Identify the service area required by the user on the map.
c.
Plan the location of each CS, taking account of distance, building materials, etc.
2. Prepare the CS for site survey
Refer to "2.8.4 Before Site Survey".
a.
Assign a CS number to each CS by setting the DIP switches on the back of the CS.
b.
Supply electricity to each CS using an AC adaptor/battery box or by connecting them to a Super Hybrid
Port or a DLC card.
c.
Install each CS temporarily as planned.
Note
•
Install at least 2 m above the floor.
•
Keep the antennas in the upright position.
3. Conduct the site survey
Refer to "2.8.5 Site Survey".
a.
Test the radio signal strength using the PS.
Confirm that the radio signal strength level is "12" near the CS.
Using the KX-TD7684/KX-TD7694
0
<< SEARCHING >>
CS NO.1 LEVEL:12
SAVE:0123456789
1
9
Press 1, 9, and POWER
for more than 2 seconds.
Display example:
1 to 9
CS No.
Using the KX-TD7680
Display example:
Press 1, 9, and POWER
for more than 2 seconds.
<< SEARCHING >>
CS NO.1 LEVEL:12
SAVE:0123456789
1 to 9
CS No.
1
9
0
Using the KX-TD7690
Display example:
Press 1, 9, and POWER
for more than 2 seconds.
<< SEARCHING >>
CS NO.1 LEVEL:12
SAVE:0123456789
1 to 9
CS No.
1
9
9
0
Installation Manual
155
2.8.2 Procedure Overview
Summary of Contents for KX-TDA30
Page 248: ...248 Installation Manual 4 1 5 Troubleshooting by Error Log ...
Page 249: ...Section 5 Appendix Installation Manual 249 ...
Page 256: ...256 Installation Manual 5 1 6 PSMPR Software File Version 5 0xxx ...
Page 257: ...Index Installation Manual 257 ...
Page 263: ...Installation Manual 263 Notes ...