Note:
(H) - (O) is refered to
ADJUSTMENTS (BASE UNIT AND CHARGER UNIT)
()
14.2.2. Flow Solder Side View
Note:
(A) - (P) is refered to
ADJUSTMENTS (BASE UNIT AND CHARGER UNIT)
()
14.3. Adjustment (Charger Unit)
Items
Adjustment
Point
Procedure
Check
Replac
Parts
(A
)
Charging Check
-
1. Connect Charge Contact 12 /2W register between and charge-.
2. Measure and confirm voltage across the regigster is 2.7V ± 0.2V.
D1, R1,
Note:
After the measuring, sock up the solder of TP.
The connection of adjustment equipment are as shown in
Adjustment Standard (Charger Unit)
().
14.4. Adjustment Standard (Charger Unit)
When connecting the Simulator Equipments for checking, please refer to below.
14.4.1. Flow Solder Side View
Note:
(A) is refered to
ADJUSTMENTS (BASE UNIT AND CHARGER UNIT)
()
15. ADJUSTMENTS (HANDSET)
If your unit have below symptoms, adjust or confirm each item using remedy column from the table.
42
Summary of Contents for KX-TCD410ALM
Page 21: ... To exit the operation press any time 21 ...
Page 48: ...18 FREQUENCY TABLE MHz 48 ...
Page 55: ...25 CPU DATA BASE UNIT 25 1 IC2 BBIC 55 ...
Page 71: ...71 ...
Page 73: ...73 ...
Page 74: ...33 ACCESSORIES AND PACKING MATERIALS 33 1 KX TCD410ALM ALS 33 2 KX TCD412ALM ALS 74 ...
Page 75: ...33 3 KX A142ALM ALS 75 ...
Page 76: ...34 TERMINAL GUIDE OF THE ICs TRANSISTORS AND DIODES 34 1 Base Unit 76 ...
Page 104: ...Clip Base PCB G N D S D A S C L 2 7V MODE SDA SCLK GND J104 J103 J102 J101 J100 ...
Page 106: ...PbF IC1 IC2 80 30 50 5 8 4 1 1 11 18 1 IC3 Marked ...
Page 108: ...4 1 5 8 PbF 1 28 18 IC3 IC2 IC1 11 64 1 16 17 32 49 48 33 Marked ...