7-41
■
Assembly of Bottom Case Ass'y
<Screw tightening torque>
Screw(N10) = 0.2 ± 0.02N·m (
ѳ
2.0 ± 0.2kgf·cm)
* Screw Locations
Not when attaching
DU CON Sponge and DU Spring.
Ԙ
Ԛ
Ԝ
Ԟ
Ԡ
ԡ
Ԣ
ԣ
Ԙ
ԙ
ԛ
ԝ
ԟ
ԙ
Ԛ
ԛ
Ԝ
ԝ
Ԟ
Ԡ
ԡ
Ԣ
ԣ
Ԥ
Bottom Case Ass'y
ԟ
Note:
Slide vertically toward
the Top Case to attach.
This is because the
mounted parts on the
Main Board may be
damaged if forcibly
attached.
Match the notch due
to the direction.
Match 4 claws to the
Connector edge and insert.
DU Spring
DU Spring
DU Spring
DU CON
DU CON
Sponge
Sponge
DU CON
Sponge
Set the Bottom Case Ass'y
to the Top Case and insert
each Lid into the Top Case.
Screw(N10)
Fix in the order.
(In the order of
Ԙ
~
Ԥ
)
When setting
the Bottom,
do not remove
the jigs from
the Modem
and LAN
Connectors.
*Note: Check that the DU Spring and DU CON Sponge inserted into
the PR PCB are in the correct positions, and then set the bottom.