Reference
Connector pin assignment table
3
1
2
1 <CCU> connector
(Hirose Electric: HR10A-10R-10P (71))
Pin No.
Function
Polarity
Flow of signal
1
CAM DATA (H)
+
CAM→ROP
2
CAM DATA (L)
-
CAM→ROP
3
CAM CONT (H)
+
ROP→CAM
4
CAM CONT (L)
-
ROP→CAM
5
CAM No.A
6
CAM No.B
7
CAM No.C
8
CAM No.D
9
12 V
10
GND
2 <LAN> connector
Complies with 100base-TX.
Allowing connection to a network device that supports the PoE standard (IEEE802.3af compliant).
3 <PREVIEW> connector
(J.S.T. Mfg. Co., Ltd.: JEY-9S-1A3F (LF))
Pins 1 and 2 are connectors for outputting the preview signal. Contact output is provided while the IRIS lever is pressed. This is a dry con-
tact.
Pin No.
Function
Flow of signal
Remarks
1
P.VIEW COM
ROP→external control
Dry contact
2
P.VIEW1
8
TALLY IN
TALLY→ROP
Dry contact
9
GND
- 136 -
Reference