Installation manual
Having installed the roof cover material, attach the
wind braces to the roof and the facia boards to the
rafters and upper wall logs.
Installation of wind braces and facia boards:
Cover boards of corner beams to be fixed with a screw on top and below with 6.4x40 mm screw
through the oblong opening. Upon subsiding of the house this screw enables to release tension of the
boards.
Covering boards may not be screwed to the wall at the middle!
It does not let the house
to sink. Screw the covering boards together with one another at their middle.
Floor
Only when the house is built completely you can install the floor boards, thus avoiding unnecessary
smudging on the floor.
Place the floor boards on the base frame, tap them lightly against one another and then nail them with
force to the foundation joists. If necessary, cut the last floor board to the suitable width.
The final operation is the fitting of the floor beadings to cover the spaces between the floor boards and
walls. If necessary, cut the floor beadings to the suitable length.
ATTENTION
: Depending on the climate at the house location, the floor boards can either swell or
diminish. If the floor boards are very dry while the climate is damp, they will easily absorb moisture. In
this case, the floor boards should not be attached very densely to avoid likely bulging. Leave some
space (1-2 mm) between the floor boards to allow for swelling. But if your climate is warm and dry, you
can install the boards densely because they will become drier and spaces may appear between them.