Installation manual
ATTENTION
:
After the first layer of logs, measure the
diagonal lengths and, if necessary, re-install the logs. Only if
the diagonal lengths are completely equal is the base frame
rectangular and you can mutually attach the logs.
Once ensured that the corner beams are not supported onto
the base frame, fix the lower wall logs with 20x20x40 mm
angels to the foundation joists (3x30 mm screws).
The first layer of logs:
Continue the installation of the walls by strongly forcing the wall logs into one another. If necessary,
use the hitting block and hammer. At the same time, do not forget to begin the installation of the door
and windows. You should definitely begin the door installation after the 5
th
-6
th
layer of logs.
Door and window
Doorframe:
If it is a double door, the
doorframe
is
supplied
in
separate
parts
due
to
transportation requirements and
you will have to begin by
assembling it.
To do this, place together the 4
parts of the frame and screw
them onto one another.
Make sure that the part of the
frame with the deeper notch is
installed upwards. The lateral
jamb parts have hinges and are
mirrored.
It is recommended to install the
leaves later.
If it is a single door, its frame and
leaf
are
supplied
already
assembled.
Doorframe installation (Only necessary for a double door!):