Page
38
of
48
6. iCELLis 500+ Control System Specifications
6.1 General Specifications
Compliance with International Standards and Guidelines
Electromagnetic
Compatibility (EMC)
The hardware has met the specification of EN 61326-1: 2013 and FCC
CFR 47 Part 15, Sections 15.107 and 15.109 (Class A)
Safety requirements for
electrical equipment for
measurement, control and
laboratory use
The hardware has met the specification of IEC 61010-1:2010 (third edition),
IEC 61010-2-010:2014 (third edition), IEC 61010-2-081:2015 (second
edition) and IEC 61010-2-051:2015
Restriction of Hazardous
Substances (RoHS)
All electrical and electronic components used in the build of the hardware
have been certified as compliant to the standard RoHS: Directive
2011/65/EU
CE Marking
The hardware has met the specification of European Directives EMC:
2014/30/EU, Low Voltage Directive (LVD) 2014/35/EU and the Machinery
Directive 2006/42/EC
ISO9001: 2008
The product is made in a manufacturing facility where the Quality
Management System is ISO9001: 2015 certified
Waste Electrical and
Electronic Equipment (WEEE)
The hardware meets the requirements of EC Directive 2012/19/EU
Materials and Specifications
Control cabinet, probe
support, leveling feet, tube
retainer, inlet gas filter holder
and exhaust filter holder
Main construction material: SS 316L & SS 304
Gas lines – Components in
direct contact with gas
Made of stainless steel or USP <88> Class VI material
Dimensions and Weight
Height
1850 mm (excluding visual alarm and tubing holders)
2122 mm (with visual alarm and tubing holders)
Width
955 mm (excluding optional high flow pump)
1038 mm (with optional high flow pump)
Length
1609 mm
Dry Weight
(without bioreactor)
650 kg
Max. Weight when loaded
(with bioreactor full of media
and double jack full of water)
< 850 kg
Services and Connections to External Circuits
Electrical power requirements
& connections
208*/230VAC – 50/60Hz
Power cables included: NEMA L6-30P & 2P+E 32A
*On a 3 phases 120 Vac network, 208 Vac can be obtained by using the
voltage between 2 phases