Chapter 7 Preparing for crane operation
Caution!
Not maintaining the minimum distances creates an acute
risk of fatality for the operator and others.
•
The operator must have full view of all crane movements.
All safety notes of chapter 2 shall be observed.
Caution!
Extending the extension booms before the main boom is in
nearly vertical position causes acute risk of fatality for the operator.
Only extend the extension booms when the main boom has been raised to a near-vertical position. See
‘Unfolding the crane’.
•
Move the main boom out of its transport position into working position.
•
Make sure that all mechanically actuated functions are properly secured with connection pin and
lynch pin.
Unfolding the crane
Operator station:
Radio-controlled
operation:
Lift the main boom.
Extend the
extension booms.
•
The crane is ready for operation.
77
Summary of Contents for PC 3800
Page 2: ......
Page 4: ......
Page 8: ......
Page 12: ......
Page 14: ......
Page 26: ......
Page 30: ......
Page 44: ......
Page 46: ......
Page 54: ......
Page 70: ......
Page 72: ......
Page 86: ......
Page 96: ......
Page 98: ......
Page 106: ......
Page 122: ......
Page 124: ......
Page 130: ......
Page 132: ......
Page 134: ......
Page 137: ...Chapter 13 C H A P T E R 1 3 Technical description 131 ...
Page 138: ...132 132 ...
Page 157: ... ...
Page 158: ......