Preparing for crane operation
Working range
Danger!
There is acute danger to life for operators and others in the
entire working range of the crane (slewing range and under
suspended loads). Allowing bystanders in the working range is
grossly negligent.
•
The operator must have full view of the crane movements and the loading/unloading point. If this is
impossible the operator must be aided by a qualified signaller.
•
Plan in sufficient clearance for crane operation and support. Crane movements may not be
obstructed by lines, masts, trees, buildings or other objects.
•
The entire working range of the crane is a danger zone.
•
No other work may be carried out within the working range.
•
Streets, path ways, bicycle lanes or sidewalks etc. that cross the working area must be blocked
during the entire crane operation.
•
The entire working range must be lit during twilight or darkness so that the work can be carried out
safely.
Danger!
In case of insufficient visibility stop work immediately.
68
Summary of Contents for PC 3800
Page 2: ......
Page 4: ......
Page 8: ......
Page 12: ......
Page 14: ......
Page 26: ......
Page 30: ......
Page 44: ......
Page 46: ......
Page 54: ......
Page 70: ......
Page 72: ......
Page 86: ......
Page 96: ......
Page 98: ......
Page 106: ......
Page 122: ......
Page 124: ......
Page 130: ......
Page 132: ......
Page 134: ......
Page 137: ...Chapter 13 C H A P T E R 1 3 Technical description 131 ...
Page 138: ...132 132 ...
Page 157: ... ...
Page 158: ......