ILF 33/44/55 Installation Manual
Rev 1.1
7
3
Important Information
Before Getting Started
“READ FIRST”
The ILF liftgate is a heavy duty industrial hydraulic lifting device. Performance and reliability
are closely related to proper installation, battery cable connections, and grounding. All
grounding surfaces MUST be cleaned, prepped, and sealed per this manual. “Cut to size”
cables MUST be properly crimped and sealed as factory supplied. All connections MUST be
dressed with dielectric grease or equivalent sealer.
Review lift gate invoice, packing slip, and installation drawing to assure delivery of correct gate
and complete delivery of accessories and optional equipment.
Read and understand the “Installation Manual” and “Owner’s Manual” in their entirety before
starting your Installation.
Refer to your truck manufacturer’s instructions before adding any auxiliary equipment.
Installer is
responsible for compliance with this manual, OEM and FMVSS requirements.
All welding should be performed by qualified personnel per AWS standards.
Always Ground closest to your welding point to prevent arcing through moving parts or electrical
parts.
Contact PALFINGER Liftgates for Special Installations not covered in this Installation Manual.
Do not paint cylinder shafts or nylon bearings (Use non-chlorinated brake cleaner to remove over
spray)
Final Check-Off-Sheet at rear of this manual MUST be filled out and kept in your records for
future reference.
Refer to owner’s manual for Operation and Maintenance information.
Check the battery voltage before installation. Flooded lead acid batteries should measure 12.6V
and AGM batteries should measure 12.8V. If batteries are not at these voltages, fully charge
before installation