ILF 33/44/55 Installation Manual
Rev 1.1
38
Circuit Breaker Installation
9.2
1. Mount the circuit breaker securely in battery box or at positive battery terminal using the buss bar,
Fig. 21
.
2. Connect the liftgate 2 Gauge cable to AUX stud on the circuit breaker.
3. Connect a 2 Gauge jumper from BAT stud on breaker to positive battery post if circuit breaker is not
mounted on battery. When circuit breaker is mounted on battery use the provided buss bar on the
“BAT” stud,
Fig. 22
.
Note: 150 amp minimum circuit breaker required.
Circuit Breaker
Location
Circuit Breaker
Location
Battery
Box
Buss
Bar
Jumper
Battery Mount
Battery Box Mount
Buss Bar To
Positive (+)
Battery
Terminal
2 Gauge Cable
from Liftgate
Mounting
Hole
Mounting
Hole
Reset Required
Fig. 22
Fig. 21