ILF 33/44/55 Installation Manual
Rev 1.1
25
2. Raise Platform
: Clamp 3” channels over the bed extension and align the front edge of the platform,
to the back edge of the bed extension,
Fig. 12
. Maintain the top of the platform flush to the bed
extension (channel).
3" Channel
Platform
Clamp
Channel flush
with platform
3.
Set “F” Dimension: “F” Dimension should be determined from Section 6 of this manual. Use floor
jack or equivalent to position the frame assembly up to the required “F” dimension,
Fig. 13
. Use a
second jack to level out the under ride guard, if necessary. Check for squareness vertically and
horizontally. 12V power supply may be required to release pressure on lift cylinder valves, if power is
required continue to the Electrical Installation in Section 9.
"F" DIM.
Secondary
Jack
Primary
Jack
Under
Ride
Guard
Mount
Frame
Tube
Fig. 12
Fig. 13