6.7 CREATION OF UTILITY HOLES ON
CLADDING
!
Utility holes must be made in the cladding for the
following:
A)
display
slot;
B)
ventilation
vents;
C) heat release in hood;
D) ventilation of cladding on base;
E) intake vents on base motor;
F) loading of pellets onto hood;
The holes must comply with the measurements
shown in Fig. 6.6.1.
6.8 CONNECTION TO SYSTEMS
6.8.1
Electrical connection
Simply connect the stove to the electricity mains
with the plug supplied.
)
%'
access also after the stove has been installed.
If the power lead is damaged it must be replaced
< =
electrician to prevent all risks.
6.8.1.1 Earthing
DANGER
> < %?"@"J"!'"
; < "
6.8.2 Control panel installation
'
using box “
A
” or recessed using box “
B
” (not
included).
DANGER
Do not install the recessed box on the hood.
)
Place the passage of the cable between the panel
and the electronic card so that it is not damaged by
temperature.
Connect the cable between the terminals of the
electronic card and the control panel before closing
the boxes.
6.8.3
Connection to room thermostat
The stove is set up for connection to an external
room thermostat (in normally open position).
Where available, on the upright of the stove there
is the connector for the insertion of the cables C
of the room thermostat , terminals
1
and
2
as per
image (Fig.6.7.3).
295
295
295
295
A
B
F
F
B
C
D
E
Fig. 6.6.1
Fig. 6.7.1
Fig. 6.7.2
1
2
3
4
1
2
3
4
Summary of Contents for Ecofire
Page 2: ......
Page 4: ...4 164 cod 00 477 1480 12 2012 Palazzetti PN Italy ...
Page 36: ...36 164 cod 00 477 1480 12 2012 Palazzetti PN Italy ...
Page 68: ...68 164 cod 00 477 1480 12 2012 Palazzetti PN Italy ...
Page 100: ...100 164 cod 00 477 1480 12 2012 Palazzetti PN Italy ...
Page 132: ...132 164 cod 00 477 1480 12 2012 Palazzetti PN Italy ...