50/164
cod. 00 477 1480 - 12/2012 - Palazzetti - PN - Italy
INSTALLATION
FRONT & FOR BUILDING IN
The probe must be inserted near the lateral or
frontal air ventilation openings on the base of the
cladding.
Stick the probe support near the air vents (Fig.
6.3.6).
6.4
HOT AIR DELIVERY CONNECTION
)
* < "
6.4.1
Protection hood connections for heating
one room
'
rotating it at the same time (Fig. 6.4.1).
Cut it to the desired length (not more than 200 cm)
and install the vents at the desired locations.
Attach the pipe (1) to the collars (3) with the clamps
(2) (Fig. 6.4.1).
Insulate the pipes with rock wool.
Fix the vents on the hood or wall at a height of at
least 1,8÷2,0 m from the ground to prevent hot air
from blowing on people.
It is not advisable to run ducts for over 2 m.
6.4.2
Duct connections for heating several
rooms
To heat several rooms it is possible to install
metal air distribution ducts in accordance with the
following outline:
j
j!jw
duct
-
smooth metal pipe or duct - up to 10 m length
for a one-way duct, 5+5 m for a two-way duct.
*
is installed; the second duct may be used to convey
hot air to the other rooms in the house.
Alternatively, connect the hot air delivery by means
channels.
The air distribution ducts must have an internal
crosssection of 20×20 cm, they must be constructed
in smooth galvanised sheet metal and insulated
with a 30 mm sheet of rockwool as a protection
from noise and heat dispersion.
(Fig. 6.4.2:
A
-Two-way duct, Fig.6.4.3
B
One- way
duct).
)
When the fireplace is used to heat 2 or more
circulation from one room to the other in order to
!'
!
Fig. 6.3.6
3
2
1
Fig. 6.4.2
Fig. 6.4.3
A
B
Fig. 6.4.1
Summary of Contents for Ecofire
Page 2: ......
Page 4: ...4 164 cod 00 477 1480 12 2012 Palazzetti PN Italy ...
Page 36: ...36 164 cod 00 477 1480 12 2012 Palazzetti PN Italy ...
Page 68: ...68 164 cod 00 477 1480 12 2012 Palazzetti PN Italy ...
Page 100: ...100 164 cod 00 477 1480 12 2012 Palazzetti PN Italy ...
Page 132: ...132 164 cod 00 477 1480 12 2012 Palazzetti PN Italy ...