background image

Instruction Manual 

Updated11/2013

20 

| 24

8.   General information

8.1  rating plate

The rating plate contains important information relating to the Wallbox. To see 
this rating plate, the cover flap of the Wallbox must be removed as described 
in "4.1  Overview and structure of the Wallbox Duo".

8.2  service notes

The Wallbox Duo is designed to require minimal maintenance. It can be 
cleaned with common detergents as necessary. Please avoid the use of scrub-
bing powders or detergents with abrasive particles. Calibrated (MID) digital 
meters are integrated into the P-CHARGE Wallbox Duo. These have a validity of 
8 years and are approved for use by third parties for the calculation of electri-
cal energy. Once this time has elapsed, either a new meter is to be installed, 
or the existing device must be audited by the calibration office / bureau of 
standards. Please ensure that the device is calibrated regularly to ensure a cor-
rect metering procedure.
 
Repeated audit tests should be carried out on the P-CHARGE Wallbox Duo 
in accordance with BGV A3 or the respective country standards and regula-
tions. The following audit test intervals apply in accordance with the following 
extract from the BGB A3. 

plant/facility/

equipment

audit test 

intervals

type of function-

ality audit

inspector

Electrical plants and fixed 

electrical installations in 

"special installations or 

locations" (DIN VDE 0100 

Group 700)

1 year

for an orderly 

condition

Qualified 

electrical 

technician

Residual current, differ-

ential current and earth 

leakage circuit breaker

-  in stationary plants

6 months

for error-free 

functionality when 

operating the test 

facility

User

We recommend that a complete functionality audit of the P-CHARGE Wallbox 
Duo be carried out every 6 months to ensure the best possible performance 
of the device. Please note that these tasks should be carried out by trained, 
technical personnel only.

8.3 trouble-shooting

In the event of an error, Button 3 resp. 6 is permanently backlit in red until the 
error is corrected.

• 

poWer failure:

 In the event of power failure, the Wallbox Duo auto-

matically shuts down. Once power is reestablished, the Wallbox Duo will 
restart by restoring the status saved at the point of outage. The power 
backup circuit board in the EWS Box must, however, now be recharged. 
This can take approx. 2-3 minutes. The Wallbox is then fully functional. 
The control elements of the Wallbox are backlit while the power backup 
circuit board is charging.

  

Wallbox type

 

Item number

 

Protection class

  

Date of manufacture

 

Serial number

  

Weight

 

Input voltage / Frequency

 

Power input








Image: Example of the rating plate

Source: BGV A3 Accident prevention regulation – Table 1A

Summary of Contents for Wallbox Duo

Page 1: ...Compact design for wall mounting for various areas of operation Instruction Manual Updated11 2013 Image P CHARGE Wallbox Duo RFID Image P CHARGE Wallbox Duo push buttons Please keep these instructions...

Page 2: ...elements 8 4 3 Electrical components 9 4 4 Socket equipment 9 4 5 Communication via EWS Box 10 4 6 Technical data independent of variant 10 4 7 Technical data independent of equipment 11 5 Installatio...

Page 3: ...l Updated11 2013 3 24 8 General information 20 8 1 Rating plate 20 8 2 Service notes 20 8 3 Trouble shooting 20 9 Conformity 22 9 1 Associated guidelines and standards 22 10 Links for support 23 11 Se...

Page 4: ...er additional functionality Working in conjunction with the SmartPvCharge or another embedded system the electric vehicle can be charged using surplus PV energy only if so required Systems such as cha...

Page 5: ...ecognize potential hazards 2 3 Person instructed in electrics The operation of the P CHARGE Wallbox Duo must be driven by a person who is fully conversant with the electrics of the system and in full...

Page 6: ...taller Warning Danger of suffocation asphyxiation Charging gassing batteries in an interior space can lead to asphyxiation According to the IEC 61851 1 the customer installed exhaust ventilation syste...

Page 7: ...on must be observed 3 Scope of delivery Please first check the physical condition of your delivered product and en sure that it is complete Please do not throw the package as this may result in damage...

Page 8: ...use of economi cal night time energy or time apportioned prioritized fleet management This functionality is only available if the Wallbox is connected to a server Left charging socket RFID card reader...

Page 9: ...er phase 100 Imp kWh Pulsation according to output kWh Consumption is displayed in kWh units L1 L2 L3 With P U I or error message the relative phase is displayed Error With missing phases or incorrect...

Page 10: ...request Dimensions Weight W H D approx 700 x 335 x 170 mm Weight variant specific approx 17 kg Installation and assembly Wall mounting Recommended installation height 1300 mm above top ground surface...

Page 11: ...60 hPa 4 7 technical Data inDepenDent of eQuipment variant e car basic e car mixed e car premium variant e car basic e car mixed e car premium item no 261010 000 261010 300 261010 400 item no 261010 0...

Page 12: ...t in damage to cabling particularly to cable strings leading to the charging sockets 5 4 Preparing the Wallbox Duo Open the front cover to the Wallbox by turning the key in the lock located on the und...

Page 13: ...ful dust amount protection against splashing water from any direction is safeguarded following mounting and installation of the cable entry glands i e appropriate cable entries must be used Cable glan...

Page 14: ...10 0mm Ensure that the holes are drilled to a sufficient depth to receive the wall plugs dowels 3 Fit each of the 6 M8x100 wafer head screws with a sealing rubber washer Position the cable bushing op...

Page 15: ...ar panel 2 Next push the housing from the front up and over the rear panel Position the housing carefully to ensure that the slots fit around the respective cable bushings of the electrical components...

Page 16: ...puter laptop via Ethernet and the EWS Box has to be configured properly For more detailed information on these EWS Box configuration settings please refer to the Links for support stated in Chapter 10...

Page 17: ...lash Press the green flashing button to start the charging process The button is backlit in green throughout the entire charging process terminate charging process step 1 To end a charging session hol...

Page 18: ...tions under Chapter 4 Installation System parameters Start charging process Step 1 To start a charging session plug the cable for the electric vehicle into the ap propriate charging socket Step 2 The...

Page 19: ...icle into the ap propriate charging socket Step 2 The Optimized Charging process is selected by pressing Button 2 or 5 respectively Depending on the parameters chosen for server connection the chargin...

Page 20: ...t intervals Type of function ality audit Inspector Electrical plants and fixed electrical installations in special installations or locations DIN VDE 0100 Group 700 1 year for an orderly condition Qua...

Page 21: ...EWS Box pins may not be correct In this case please contact your service partner Error Activate contactor Here there is a faulty contact in the EWS Box in the contactor terminal X102 at contactor EV 1...

Page 22: ...mmunity test IEC 61000 4 2 2009 and or EN 61000 4 2 Testing and measurement techniques Electrostatic discharge immunity test IEC 61000 2 2 2002 and or EN 61000 2 2 Environment Compatibility levels for...

Page 23: ...tructions_V1_I800025GB pdf EWS Box Quick guide to operations HTML configuration www schletter de EN download traffic engineering ews box html P CHARGE_EWS Box_ _Administration_V1_I800024GB pdf EWS Box...

Page 24: ...In the event of a warranty claim the company Schletter GmbH shall bear the costs required for transport travel labour and materials only excluded are the additional and potentially substantial costs i...

Reviews: