Instruction Manual 

Updated11/2013

| 24

4.   General

4.1 overvieW anD structure of the Wallbox Duo

Here is an image of the P-CHARGE Wallbox Duo with an explanation of the 
individual components. To open the housing cover, insert key into the push 
cylinder of the locking system and turn this to the left or to the right. The sys-
tem is unlocked when the cylinder slides forwards. The housing cover can then 
be pulled forwards at the lower end and lifted off. To close the Wallbox, replace 
the housing cover from above, turn the key in the lock to the vertical position 
and push in the locking cylinder.

4.2 control elements

This is a short description of the user elements and of the buttons at the 
Wallbox.

* "optimizeD charging"

The function "Optimized charging" means that the charging procedure is con-
trolled according to the previously defined parameters and is saved to a server 
by the user. These parameters may, for example, apply to the use of economi-
cal, night-time energy or time-apportioned / prioritized fleet management. 
This functionality is only available if the Wallbox is connected to a server.

  

Left charging socket

 

RFID card reader (according to variant)

 

Right charging socket

  

Control elements right charging socket

 

Filter fleece

  

Locking system

 

Filter fleece

 

Control elements left charging socket 

  

RCBO left side

 

Rating plate

 

RCBO right side

  

Button 4

 

Button 6

  

Button 5

 

Meter right side

 

Control fuse 

 

Meter left side

 

Button 2

 

Button 3

 

Button 1

button

Button 1

Button 3

Button 2

Button 4

Button 6

Button 5

1

 

Only with server operation

Start button left charging socket

Optimized charging

1

 

left charging socket
Stop button left charging socket

Start button right charging socket

Optimized charging

1

 

right charging socket
Stop button right charging socket

name

function

Start the charging process 
at left charging socket
Start the charging process 
"Optimized charging"*
End the charging process 
at left charging socket
Start the charging process 
at right charging socket
Start the charging process 
"Optimized charging"*
End the charging process 
at right charging socket



Summary of Contents for Wallbox Duo

Page 1: ...Compact design for wall mounting for various areas of operation Instruction Manual Updated11 2013 Image P CHARGE Wallbox Duo RFID Image P CHARGE Wallbox Duo push buttons Please keep these instructions...

Page 2: ...elements 8 4 3 Electrical components 9 4 4 Socket equipment 9 4 5 Communication via EWS Box 10 4 6 Technical data independent of variant 10 4 7 Technical data independent of equipment 11 5 Installatio...

Page 3: ...l Updated11 2013 3 24 8 General information 20 8 1 Rating plate 20 8 2 Service notes 20 8 3 Trouble shooting 20 9 Conformity 22 9 1 Associated guidelines and standards 22 10 Links for support 23 11 Se...

Page 4: ...er additional functionality Working in conjunction with the SmartPvCharge or another embedded system the electric vehicle can be charged using surplus PV energy only if so required Systems such as cha...

Page 5: ...ecognize potential hazards 2 3 Person instructed in electrics The operation of the P CHARGE Wallbox Duo must be driven by a person who is fully conversant with the electrics of the system and in full...

Page 6: ...taller Warning Danger of suffocation asphyxiation Charging gassing batteries in an interior space can lead to asphyxiation According to the IEC 61851 1 the customer installed exhaust ventilation syste...

Page 7: ...on must be observed 3 Scope of delivery Please first check the physical condition of your delivered product and en sure that it is complete Please do not throw the package as this may result in damage...

Page 8: ...use of economi cal night time energy or time apportioned prioritized fleet management This functionality is only available if the Wallbox is connected to a server Left charging socket RFID card reader...

Page 9: ...er phase 100 Imp kWh Pulsation according to output kWh Consumption is displayed in kWh units L1 L2 L3 With P U I or error message the relative phase is displayed Error With missing phases or incorrect...

Page 10: ...request Dimensions Weight W H D approx 700 x 335 x 170 mm Weight variant specific approx 17 kg Installation and assembly Wall mounting Recommended installation height 1300 mm above top ground surface...

Page 11: ...60 hPa 4 7 technical Data inDepenDent of eQuipment variant e car basic e car mixed e car premium variant e car basic e car mixed e car premium item no 261010 000 261010 300 261010 400 item no 261010 0...

Page 12: ...t in damage to cabling particularly to cable strings leading to the charging sockets 5 4 Preparing the Wallbox Duo Open the front cover to the Wallbox by turning the key in the lock located on the und...

Page 13: ...ful dust amount protection against splashing water from any direction is safeguarded following mounting and installation of the cable entry glands i e appropriate cable entries must be used Cable glan...

Page 14: ...10 0mm Ensure that the holes are drilled to a sufficient depth to receive the wall plugs dowels 3 Fit each of the 6 M8x100 wafer head screws with a sealing rubber washer Position the cable bushing op...

Page 15: ...ar panel 2 Next push the housing from the front up and over the rear panel Position the housing carefully to ensure that the slots fit around the respective cable bushings of the electrical components...

Page 16: ...puter laptop via Ethernet and the EWS Box has to be configured properly For more detailed information on these EWS Box configuration settings please refer to the Links for support stated in Chapter 10...

Page 17: ...lash Press the green flashing button to start the charging process The button is backlit in green throughout the entire charging process terminate charging process step 1 To end a charging session hol...

Page 18: ...tions under Chapter 4 Installation System parameters Start charging process Step 1 To start a charging session plug the cable for the electric vehicle into the ap propriate charging socket Step 2 The...

Page 19: ...icle into the ap propriate charging socket Step 2 The Optimized Charging process is selected by pressing Button 2 or 5 respectively Depending on the parameters chosen for server connection the chargin...

Page 20: ...t intervals Type of function ality audit Inspector Electrical plants and fixed electrical installations in special installations or locations DIN VDE 0100 Group 700 1 year for an orderly condition Qua...

Page 21: ...EWS Box pins may not be correct In this case please contact your service partner Error Activate contactor Here there is a faulty contact in the EWS Box in the contactor terminal X102 at contactor EV 1...

Page 22: ...mmunity test IEC 61000 4 2 2009 and or EN 61000 4 2 Testing and measurement techniques Electrostatic discharge immunity test IEC 61000 2 2 2002 and or EN 61000 2 2 Environment Compatibility levels for...

Page 23: ...tructions_V1_I800025GB pdf EWS Box Quick guide to operations HTML configuration www schletter de EN download traffic engineering ews box html P CHARGE_EWS Box_ _Administration_V1_I800024GB pdf EWS Box...

Page 24: ...In the event of a warranty claim the company Schletter GmbH shall bear the costs required for transport travel labour and materials only excluded are the additional and potentially substantial costs i...

Reviews: