page.
10
/
42
10
INSTALLATION
4.3
INSTALLATION SETTINGS
►
Care should be taken for the floor to be straight and sound the
machine will be positioned. Note that there will be sufficient distance
around the machine in order to work safely, for easy servicing and
maneuvers.
►
The machine should be scaled. The machine that is well scaled will
reduce the vibration, working will be easier and the production and the
quality will also increase.
►
Pressure of air should constitute 6-8 Bar. Usage of a thick hose
interferes with air pressure decrease on all length of a line. Besides, it is
necessary to avoid hit of moisture for the prevention of breakage of
valves and pneumocylinders.
►
Warning:
if there is no air dryer in the pneumatic system connection
of machine, parts of the pneumatic group are not subject to warranty
service!
►
The electrical connections of the machine should be done by the
service staff or qualified electrician.
►
The used electric switchboard should correspond to norms of safety
and electric standards. The voltage stabilizer should be connected to a
line of a supply of electricity.
►
The grounding contour prevents aggrieving to the user by wandering
currents, for this reason the correct system and reliability of a contour of
grounding has special importance.
►
Grounding line should be connected to the machine body.
►
Voltage changes, its increase and decrease is harmful and dangerous
to the equipment. To prevent these events use a voltage stabilizer.
Otherwise the manufacturer does not bear any responsibility for possible
malfunctions.
►
Warning: if there is no voltage stabilizer in electric system connection
of the machine, parts of electric and pneumatic are not subject to
warranty service!
►
In the machine used a cable with 4 pins (3 1 neutral),
corresponding to IP 44 standards and the power of machine. It is
necessary to ensure that similar standards for plug sockets.