Install the IntrCooll®
Version 1.3, 2021-12-14
51
1
2
3
4
5
C
Thermostat connected with correct cable, to specified connection
in IntrCooll®?
o
o
D
If Oxyconnect gateway is ordered, are necessary preparations
done?
o
o
E
If Building Management System will control the unit, is contractor
informed to take care of installation?
o
o
F
IntrCooll® used as AHU pre-cooling, is unit connected to specified
instructions?
o
o
Remarks:
6
Water Supply requirements
YES
NO
A
Local water quality according to specification?
o
o
Supply water quality
requirements
B
Measured and noted the conductivity of the water on the site?
o
o
Supply water quality
requirements
C
Water Supply according to specifications?
o
o
Supply connections
D
Shut- off valve provided and installed by contractor?
o
o
E
Maintenance water connection/valve provided and installed by
contractor?
o
o
F
Prepare piping for drain and overflow connection.
o
o
G
Drain valve installed according instructions?
o
o
Step 4. Drain valve installation
Remarks:
Summary of Contents for 3800OXYSTD
Page 2: ......
Page 4: ...4 ...
Page 10: ...10 ...
Page 12: ...Sticker manuals inside 12 ...
Page 52: ...52 ...
Page 67: ...Version 1 3 2021 12 14 67 Appendices ...
Page 68: ...68 ...