VZR.248100.000 IG
K-14 Swing gate
Installation Guidelines
6
3
THE PRODUCT PREPARATION FOR INSTALLATION
3.1 Procedure for product transportation to the installation site
The product in the original packaging can be transported without limiting
the range by air, paved roads and rail transport provided it is protected against
direct exposure to precipitation and dust.
In order to avoid condensation of moisture after transportation at negative
temperature, the product should be held in a room with normal climatic conditions
for 12 hours.
Loading and unloading operations should be carried out in compliance with
safety regulations.
3.2 Rules of the unpacking of the product
3.2.1
Perform visual inspection of the packaging. The packaging
should not have visible damages.
3.2.2
Open transportation box, unpack and inspect completeness of
the product:
1)
Swing gate;
2)
Control panel with cable.
3.3 Rules of the product visual inspection
3.3.1
Check completeness of the product.
Completeness should be checked according to VZR.248100.000 DTS
Product status record.