VZR.248100.000 IG
K-14 Swing gate
Installation Guidelines
18
7
COMMISSIONING OF THE MOUNTED PRODUCT
Commissioning of the mounted product should be performed in the
following order:
1)
representative of organization which performed installation work demonstrates reliability
of the product installation;
2)
mark on the product installation are made in VZR.248100.000 DTS
Product status record
,
in the section "Product movement in the course of operation";
3)
"Data on installation" section of 248100.000 DTS
Product status record
on the product is
filled in;
4)
Act of acceptance in operation is made out.