INSTALLATION AND SETTING TO WORK
KMW3000C
Version 1
USER MANUAL
KMW3000CChiller v1.1.doc
Page
10
5. Handling, Installation, Storage and
Transit Information
5.1 Reception and Handling
5.1.1 Delivery
The following steps should be carried out on delivery of the system and before unpacking the
KMW3000C chiller.
1. When the system arrives, check that there is no visible damage, with the delivery driver present.
If damage has occurred contact the carrier and Oxford Diffraction
immediately
.
2. Check that shock-watch and tilt indicators fitted to the outside of the packing case have not
been activated. If the indicators have been activated notify Oxford Diffraction
immediately
.
3. Check the number of delivered items against the packing list. If any items are missing contact
Oxford Diffraction within 3 days.
WARNING
The packing crate is heavy and could cause serious injury and
damage to the equipment if not handled correctly. Use suitable lifting
equipment and procedures. Only lift the packing case from the
bottom.
CAUTION
Do not remove the equipment from the packing crate until it has been moved to its
designated installation site. The equipment has been carefully packed to protect the
equipment from damage in transit. Removal of the packing equipment could make
the equipment vulnerable to damage during transit.
4. Always lift the packing case from the bottom using suitable lifting equipment (refer to list of
component weights in the following section.
5. Move the packing case into the designated installation site.
6. Contact Oxford Diffraction to notify them that the equipment is awaiting installation by a factory
trained service representative.
5.1.2 Unpacking
1. Retain all packing material until installation of the system is completed.
5.1.3 Weights, Dimensions and Lifting Points
Description Weight
kg
Dimensions (length x
width x height)
Centre of gravity Lifting points
KMW3000C Chiller 56
75 x 38 x 54
Centre of unit
At the four corners
and from below