Page | 16
www.outdoorrooms.com
BCH-1242 42477 REV A
6
Lighting and Operation
A. Lighting Instructions for
Manual Ignition
1.
Ensure that burner and igniter is free of
obstructions and debris.
2.
Depress button of push-button sparker
and verify that a spark is being produced
between the sparking electrode and the
ground electrode (
Image 6.1
).
3.
Ensure that control valve is in the “OFF”
position
(
Image 6.2
)
.
If using a 20 lb. LP
tank, slowly open the valve on the tank
(
Image 6.3
).
4.
Depress button of push-button sparker
and turn control valve to “ON” position
while still depressing sparker. Continue
holding sparker button until burner
ignites.
If ignition does not occur within
15 seconds, turn control valve to “OFF”
position and wait 5 minutes before
attempting ignition again. This allows gas
to dissipate.
5.
To extinguish, turn control valve to “OFF”
position. If using a 20 lb. LP tank,
close the
valve on the tank when not in use
.
IMPORTANT
:
The Boreal Complete Heat requires an initial burn-off period of 4 hours. The first time the appliance is fired,
it should be allowed to operate for 4 hours to allow residue from the coating process to burn off. After this
burn-off period, once the appliance has cooled for 1 hour, the heat exchanger tubes should be wiped clean
with a damp cotton rag. ONLY USE WATER TO WIPE THE HEAT EXCHANGER TUBES.
WARNING:
FIRE RISK
EXPLOSION RISK
Failure to follow these lighting instructions
may result in delayed ignition and explosion or
fire.
6.1
6.2
6.3