Operation system
GB
40
DTX 2500 TIG
DTX 2500 TIG
Chosen
frequency Hz
%
Display
DC
0,3
12,5%
0,31
0,3
25,0%
0,32
0,3
50,0%
0,33
0,3
75,0%
0,34
0,5
12,5%
0,51
0,5
25,0%
0,52
0,5
50,0%
0,53
0,5
75,0%
0,54
1
12,5%
1,1
1
25,0%
1,2
1
50,0%
1,3
1
75,0%
1,4
3
25,0%
3,1
3
50,0%
3,2
3
75,0%
3,3
5
25,0%
5,1
5
50,0%
5,2
5
75,0%
5,3
10
25,0%
10,1
10
50,0%
10,2
10
75,0%
10,3
15
25,0%
15,1
15
50,0%
15,2
15
75,0%
15,3
20
25,0%
20,1
20
50,0%
20,2
20
75,0%
20,3
30
25,0%
31
30
50,0%
32
30
75,0%
33
50
25,0%
51
50
50,0%
52
50
75,0%
53
80
25,0%
81
80
50,0%
82
80
75,0%
83
100
25,0%
101
100
50,0%
102
100
75,0%
103
Setting the main current:
You can adjust a value from 5 A to the maximum welding current of the power source.
Setting the slope-down time (Slope-Down):
You can choose a value between 0 and 20 seconds. This value can be adjusted
individual for each welding program (except during the electrode welding).
Setting the final current:
You can adjust a value from 5 A to the maximum welding current of the power source.
Setting the gas post-flow:
You can choose a value between 0 and 20 seconds.