The complete closure and alignment is displayed by the arrows on the machine (SEE
PHOTO) and the display of the icon in position 6 on the radio control.
‑
The stabilisers must be lowered from the control position in the basket. Make sure that
visibility of the trajectory of each stabiliser is perfect before moving it.
‑
Select the engine/motor speed as required and check the selection on the display. Always
perform stabilisation at slow speed.
‑
Press and hold the automatic stabilisation button 7 (see the corresponding paragraph). If
the movements are selected with the machine not completely closed and aligned, an
error message will be shown on the display.
‑
Stabilisation will be completed when the machine is in horizontal position with toleran‑
ce of 1° and lifted at least 5 cm from the ground. Correct stabilisation will be confirmed
by the icon in position 5 on the display.
Always check the spirit level and make sure the slope is actually less than 1°.
X17JR0420113
BOOM LIFT MODELS X17J
JLG
79
Summary of Contents for X17J
Page 2: ......
Page 43: ...X17JR0420113 BOOM LIFT MODELS X17J JLG 39 ...
Page 72: ...6 3 WORKING AREA X17JR0420113 68 BOOM LIFT MODELS X17J JLG Rotation 360 Rotation 360 ...
Page 121: ...117 BOOM LIFT MODELS X17J JLG X17JR0420113 ...
Page 166: ...12 2 HYDRAULIC SYSTEM DIAGRAM LITHIUM VERSION X17JR0420113 162 BOOM LIFT MODELS X17J JLG ...
Page 170: ... LITHIUM VERSION X17JR0420113 166 BOOM LIFT MODELS X17J JLG ...