![background image](http://html1.mh-extra.com/html/oshkosh/x17j/x17j_operation-safety-and-maintenance-manual_1655726116.webp)
HATZ DIESEL ENGINE
* First operation.
** At least every 3 months.
*** At least every 5 years.
# Anyway every year. If the tightening is not correct replace the nuts with two new with the same
specifications and restore the connection without using oil or grease.
As regards complete service of the engine, see the manual supplied by the engine manufacturer or
download it from the website: www.hatz‑diesel.com
X17JR0420113
112
BOOM LIFT MODELS X17J
JLG
PART
MAINTENANCE
WORK
BEFORE
STARTING
AS NEEDED
INTERVAL (HOURS)
10
50
100
250
500
1000
2000
DRY AIR FILTER
CHECK, CLEAN
•
REPLACE
•
ENGINE OIL
CHECK LEVEL
•
•
CHANGE
•
*
•
ENGINE OIL FILTER
CLEAN
•
REPLACE
•
FUEL FILTER
CLEAN
•
REPLACE
•
WATER SEPARATOR
CLEAN AND DRAIN
WATER
•
•
*
•
COOLING SYSTEM
CHECK FLUID LEVEL
•
TOP UP/CHANGE
FLUID
•
HYDRAULIC OIL
CHECK LEVEL
•
CHANGE
•
HYDRAULIC OIL
FILTER
REPLACE CARTRIDGE
•
*
•
ARTICULATED JOINT
POINTS
GREASE
•
*
•
BATTERY
CHECK ELECTROLYTE
LEVEL
•
•
REDUCTION GEAR
OIL
CHECK LEVEL
•
CHANGE
•
*
•
MACHINE
GENERAL PERIODICAL
CHECKS
•
•
*
EXTENSION ARM
INTERNAL SLIDING
RING
CHECK WEAR
•
REPLACE
•
TURNTABLE BOLT
TIGHTENING
CHECK
•
*
•
NUT FIXING PINS
BASKET
CHECK TORQUE
200 Nm
•#
Summary of Contents for X17J
Page 2: ......
Page 43: ...X17JR0420113 BOOM LIFT MODELS X17J JLG 39 ...
Page 72: ...6 3 WORKING AREA X17JR0420113 68 BOOM LIFT MODELS X17J JLG Rotation 360 Rotation 360 ...
Page 121: ...117 BOOM LIFT MODELS X17J JLG X17JR0420113 ...
Page 166: ...12 2 HYDRAULIC SYSTEM DIAGRAM LITHIUM VERSION X17JR0420113 162 BOOM LIFT MODELS X17J JLG ...
Page 170: ... LITHIUM VERSION X17JR0420113 166 BOOM LIFT MODELS X17J JLG ...