TGPS-9084GT-M12 Series User
Manual
ORing Industrial Networking Corp
16
2. Set one of the connected switches to be the master and make sure the port setting of each
connected switch on the management page corresponds to the physical ports connected. For
information about the port setting, please refer to 4.1.2 Configurations.
3. Connect the last switch to the first switch to form a ring topology.
Coupling Ring
If you already have two O-Ring topologies and would like to connect the rings, you can form
them into a coupling ring. All you need to do is select two switches from each ring to be
connected, for example, switch A and B from Ring 1 and switch C and D from ring 2. Decide
which port on each switch to be used as the coupling port and then link them together, for
example, port 1 of switch A to port 2 of switch C and port 1 of switch B to port 2 of switch D.
Then, enable Coupling Ring option by checking the checkbox on the management page and
select the coupling ring in correspondence to the connected port. For more information on port
setting, please refer to 4.1.2 Configurations. Once the setting is completed, one of the
connections will act as the main path while the other will act as the backup path.