User manual
FLEXI 50
12
Install the air duct with the minimum slope of 3 mm downwards from the outer wall side. Fill the gaps
between the wall and the hole with a mounting foam.
3.
Installation of outer ventilation hood
The mounting sequence of the outer ventilation hood is described in the installation instruction for
the ventilation hood.
4.
Positioning and installation of the indoor unit
Stick the delivered cardboard master plate on the indoor wall using a mounting tape. The large opening in the
master plate must be axially aligned with the air duct. Align the master plate horizontally with a building level.
Then mark the fastening holes for installation of the supplied dowels and drill the holes to a required depth.
Route the power cable from the wall through the marked opening on the template.