![Opop Biopel MINI Installation And Operation Instructions Manual Download Page 13](http://html1.mh-extra.com/html/opop/biopel-mini/biopel-mini_installation-and-operation-instructions-manual_1640496013.webp)
Biopel MINI - Installation and Operation Instructions
13
6.1.
Hopper
The compact pellet hopper installation is very simple, as it is already pre-assembled in the factory. Unpack the hopper
from the slatting, remove the protective film and place the hopper next to the boiler. Check the ash door opening. If the
hopper is on the side of the boiler with the ash door hinges, you must move the hinges to the opposite side of the boiler
so that the hinges do not cause the doors to get stuck.
6.1.1.
External Hopper
A
B
D
C
F
F
E
F
B
A
1
2
E
3
4
D
C