Safety and Installation Manual

 

 1

st

 Generation                             2

nd

 Generation                                  3

rd

 

Generation

Drawing  3:  Clamp mounting positioning

Drawing  4:  Frame Generations

 6.0

Electrical Installation

➢ 

PV modules of different size and/or electrical configurations must not be used in the same system.

➢ 

Open Renewables

®

 PV modules are factory-equipped with cables and connectors for easy interconnect in series.

➢ 

Cover   all   modules   in   the   PV   array   with   an   opaque   cloth   or   material   before   making   or   breaking   electrical  

connections.

➢ 

Open   Renewables

®

  recommends   that   all   wiring   be   double   insulated   with   a   minimum   temperature   rating   of  

110°C. All wiring should use flexible copper (Cu) conductors. The minimum size should be determined by the  

applicable codes. We recommend a size not less than 4mm

2

. The insulation type should be appropriate for the  

type of installation method used and must meet SKII (Safety Class II) and IEC 61730 requirements."

➢ 

Match   the   polarities   of   cables   and   terminals   when   making   the   connections;   failure   to   do   so   may   result   in  

damage to the PV module.

➢ 

Ensure that all electrical connections are secure and tight.

➢ 

A bypass-diode is integrated in one of the 2 PV module junction boxes. This diode is not user-replaceable. The  

junction box must not be opened in the field. Doing so will void the warranty.

➢ 

When connecting module in series be aware the module voltages will be summed. The maximum number of PV  

modules being connected in series must be calculated in line with the applicable regulations in such a way that  

the specified maximum system voltage of the PV module and all other electrical DC components will not be  

exceeded in open-circuit operation. 

➢ 

Not more than 2 PV modules or module strings shall be connected in parallel without using series fuses rated at  

20 Ampere minimum.

➢ 

PV modules with a suspected electrical problem should be returned to Open Renewables

®

  for inspection and  

subsequent actions as described in the Open Renewables

®

 LIMITED WARRANTY FOR PV-MODULE(S).

 6.1

Safety-related grounding of module frames

➢ 

Open Renewables

®

  strongly recommends grounding of PV module frames even when applicable regulations,  

code requirements and standards do not require any safety-related grounding. On 1

st

 and 2

nd

 generation frames  

the long frame rails are provided with holes should be used for grounding purposes only and in accordance  

with the local regulations, code requirements and standards, as per drawing 4, bellow. On the 3

rd

  generation  

the any of the corner pieces can be used to connect the module to ground using a self tapping screw, ST 4.8  

with a length between 6 and 16mm.

Page  8 of 12

Document ID: OR-MA-2XX Revision 4.50 04-03-2013

© 2013 Open Renewables

®

 – All rights reserved

EN

Applicable only in European Union

Summary of Contents for 175-ME48

Page 1: ...1 0 Safety Installation Manual Open Renewables PV modules Applicable only in European Union Revision 4 50 7th March 2013...

Page 2: ...on for operation 7 4 1 Storage 7 4 2 Unpacking 7 5 0 Mechanical Installation 7 5 1 Method A 8 5 2 Method B 8 6 0 Electrical Installation 9 6 1 Safety related grounding of module frames 9 7 0 Operation...

Page 3: ...to the PV system owner Follow all applicable national and international regulations and standards When unpacking and installing PV modules and BOS components unauthorized people shall be kept in a sav...

Page 4: ...tem integration parameters and specific ambient conditions of each solar module model please refer to the appliable and valid datasheet The lastest data sheets can be downloaded from Open Renewables w...

Page 5: ...ly to produce more current and or voltage than reported at Standard Test Conditions 1000 W m2 AM 1 5 and 25 C cell temperature Accordingly the values of short circuit current Isc and open circuit volt...

Page 6: ...a tilt angle of min 15 degrees in order to allow any dirt being washed away from rain Use support structures specialized for PV applications and designed for local maximum wind and snow loads Ensure t...

Page 7: ...ld be centred with the area marked as per drawing 3 Some models have a pre printed mark on the frame for easier mounting Follow the mounting instructions of the substructure manufacturer Use appropria...

Page 8: ...o will void the warranty When connecting module in series be aware the module voltages will be summed The maximum number of PV modules being connected in series must be calculated in line with the app...

Page 9: ...be affected by dust dirt or other deposits on the surface In this case Open Renewables recommends cleaning the surface of the modules with cold water and a sponge Do not use harsh cleaning materials s...

Page 10: ...afety Installation and Operation Manual and the methods and conditions of handling installation operation and maintenance of the PV modules are beyond Open Renewables control Open Renewables does not...

Page 11: ...50 PS60 255 PS60 260 PS60 We herewith confirm on our sole responsibility that above mentioned products meet the requirements on the following directives and Standards Directive 2006 95 EC Electrical E...

Page 12: ...m Auspacken der Solar module Portez les chaussures les gants et les lunettes protecteurs tout en d ballant les modules Utilize sapatos luvas e culos de protec o quando desempacotar os m dulos solares...

Reviews: