Safety & Installation Manual

Open Renewables

®

 PV modules

Applicable only in European Union
Revision 4.50 - 7

th

 March 2013

Summary of Contents for 175-ME48

Page 1: ...1 0 Safety Installation Manual Open Renewables PV modules Applicable only in European Union Revision 4 50 7th March 2013...

Page 2: ...on for operation 7 4 1 Storage 7 4 2 Unpacking 7 5 0 Mechanical Installation 7 5 1 Method A 8 5 2 Method B 8 6 0 Electrical Installation 9 6 1 Safety related grounding of module frames 9 7 0 Operation...

Page 3: ...to the PV system owner Follow all applicable national and international regulations and standards When unpacking and installing PV modules and BOS components unauthorized people shall be kept in a sav...

Page 4: ...tem integration parameters and specific ambient conditions of each solar module model please refer to the appliable and valid datasheet The lastest data sheets can be downloaded from Open Renewables w...

Page 5: ...ly to produce more current and or voltage than reported at Standard Test Conditions 1000 W m2 AM 1 5 and 25 C cell temperature Accordingly the values of short circuit current Isc and open circuit volt...

Page 6: ...a tilt angle of min 15 degrees in order to allow any dirt being washed away from rain Use support structures specialized for PV applications and designed for local maximum wind and snow loads Ensure t...

Page 7: ...ld be centred with the area marked as per drawing 3 Some models have a pre printed mark on the frame for easier mounting Follow the mounting instructions of the substructure manufacturer Use appropria...

Page 8: ...o will void the warranty When connecting module in series be aware the module voltages will be summed The maximum number of PV modules being connected in series must be calculated in line with the app...

Page 9: ...be affected by dust dirt or other deposits on the surface In this case Open Renewables recommends cleaning the surface of the modules with cold water and a sponge Do not use harsh cleaning materials s...

Page 10: ...afety Installation and Operation Manual and the methods and conditions of handling installation operation and maintenance of the PV modules are beyond Open Renewables control Open Renewables does not...

Page 11: ...50 PS60 255 PS60 260 PS60 We herewith confirm on our sole responsibility that above mentioned products meet the requirements on the following directives and Standards Directive 2006 95 EC Electrical E...

Page 12: ...m Auspacken der Solar module Portez les chaussures les gants et les lunettes protecteurs tout en d ballant les modules Utilize sapatos luvas e culos de protec o quando desempacotar os m dulos solares...