Safety and Installation Manual

 3.3

Fire Safety

➢ 

Follow all applicable standards and requirements for fire safety.

➢ 

The installation of a PV system on a building may affect fire safety. For roof  

application, the  PV system must be mounted over fire resistant roof covering  

rated for the application.

➢ 

Do not install or use PV modules near hazardous locations with  

flammable gases.

 DC Switch

 

Inverter

 AC Switch

 Grid

 4.0

Preparation for operation

 4.1

Storage

➢ 

For transportation of Open Renewables

®

 modules shall be on the original product packing.

➢ 

Store the products within the storage conditions limits.

➢ 

Secure modules against falling and scratching.

 4.2

Unpacking

➢ 

Please read, understand and follow the unpacking instructions, on this manual. 

➢ 

Notice   that   the   packing   instructions   may   change   without   prior   notice,   therefore   you   should   consult   Open  

Renewables

®

 website or request your distributor for the latest version.

 5.0

Mechanical Installation 

➢ 

Install the PV modules under a tilt angle of min. 15 degrees in order to allow any dirt being washed away from  

rain.

➢ 

Use support structures specialized for PV applications and designed for local maximum wind and snow loads.  

Ensure the PV modules are not subjected beyond the specified wind or snow loads.

➢ 

Ensure   PV   modules   are   not   subjected   to   excessive   forces   resulting   from   thermal   expansions   of   the   support  

structure.

➢ 

The support structure must not cause any bending or twisting of the PV module.

➢ 

The   distance   between   the   rear   module   surface   and   the   roof   shall   be   at   least   100   mm   to   allow   for   proper  

cooling.   A   minimum   clearance   between   PV   modules   of   at   least   1.0   cm   is   required   to   allow   for   thermal  

expansion of the PV frames.

➢ 

Keep the rear surface of the PV modules free from any objects which could come into contact with the module,  

particularly under mechanical load.

➢ 

Do not drill any holes on the frames. Modules equipped with 3

rd

 generation frames do not have any pre-drilled  

holes. Customers requiring pre-drilled holes should order them in advance.

Page  6 of 12

Document ID: OR-MA-2XX Revision 4.50 04-03-2013

© 2013 Open Renewables

®

 – All rights reserved

EN

Applicable only in European Union

Summary of Contents for 175-ME48

Page 1: ...1 0 Safety Installation Manual Open Renewables PV modules Applicable only in European Union Revision 4 50 7th March 2013...

Page 2: ...on for operation 7 4 1 Storage 7 4 2 Unpacking 7 5 0 Mechanical Installation 7 5 1 Method A 8 5 2 Method B 8 6 0 Electrical Installation 9 6 1 Safety related grounding of module frames 9 7 0 Operation...

Page 3: ...to the PV system owner Follow all applicable national and international regulations and standards When unpacking and installing PV modules and BOS components unauthorized people shall be kept in a sav...

Page 4: ...tem integration parameters and specific ambient conditions of each solar module model please refer to the appliable and valid datasheet The lastest data sheets can be downloaded from Open Renewables w...

Page 5: ...ly to produce more current and or voltage than reported at Standard Test Conditions 1000 W m2 AM 1 5 and 25 C cell temperature Accordingly the values of short circuit current Isc and open circuit volt...

Page 6: ...a tilt angle of min 15 degrees in order to allow any dirt being washed away from rain Use support structures specialized for PV applications and designed for local maximum wind and snow loads Ensure t...

Page 7: ...ld be centred with the area marked as per drawing 3 Some models have a pre printed mark on the frame for easier mounting Follow the mounting instructions of the substructure manufacturer Use appropria...

Page 8: ...o will void the warranty When connecting module in series be aware the module voltages will be summed The maximum number of PV modules being connected in series must be calculated in line with the app...

Page 9: ...be affected by dust dirt or other deposits on the surface In this case Open Renewables recommends cleaning the surface of the modules with cold water and a sponge Do not use harsh cleaning materials s...

Page 10: ...afety Installation and Operation Manual and the methods and conditions of handling installation operation and maintenance of the PV modules are beyond Open Renewables control Open Renewables does not...

Page 11: ...50 PS60 255 PS60 260 PS60 We herewith confirm on our sole responsibility that above mentioned products meet the requirements on the following directives and Standards Directive 2006 95 EC Electrical E...

Page 12: ...m Auspacken der Solar module Portez les chaussures les gants et les lunettes protecteurs tout en d ballant les modules Utilize sapatos luvas e culos de protec o quando desempacotar os m dulos solares...

Reviews: