4.2.2 Long Commissioning
The Long Commissioning is an extension of the Short Commissioning. Long
Commissioning helps to configure the meter, units of measurement, and the
auxiliary inputs outputs, or an analog output.
From the Short Commissioning, press
NEXT
if you wish to access the remaining
commissioning mode display pages.
Press
EDIT
, then
MORE
to select where the meter is located. Options include:
Supply or Return. To continue, press
SAVE
and then
NEXT
.
Setting the current time for the meter. Press
EDIT
, then
MORE
to set hour,
minute, and second. To continue, press
SAVE
and then
NEXT
.
Setting the current date for the meter. Press
EDIT
, then
MORE
to set year, month,
and day. To continue, press
SAVE
and then
NEXT
.
Use this menu option to continue commissioning or return to normal operation.
Press
NEXT
to continue the meter set, or press
SAVE
to complete the installation.
4.2.1.3 Additional Displays
Additional displays can be configured after selecting the communication.
Meter Location
NEXT
Supply
EXIT
EDIT
Set Time
NEXT
HH:MM:SS
EXIT
EDIT
Set Date
NEXT
YYYY/MM/DD
EXIT
EDIT
Set Meter
Press NEXT edit units
of measure
SAVE completes install
with current settings
NEXT
BACK
SAVE
Set Meter
Press NEXT edit units
of measure
SAVE completes install
with current settings
NEXT
BACK
SAVE
CAUTION
Do NOT press SAVE of you wish to continue commissioning the meter.
Otherwise, Commissioning Mode can be returned by holding the
commissioning push button (terminal block SW6) until the commissioning
display pages coming back. Refer to section 3.6 POWER AND SIGNAL
WIRING CONNECTIONS for more details on the commissioning push button
location.