oneida-air.com
9
Assembly Instructions (Continued)
FIG. 2
2
Align the Latches (G14) onto the holes on
either side of the Wall Bracket (F) and secure
them in place using two Pan-Head Screws
(G15) and Nylock Nuts (G16) [FIG 2].
Note: Firmly tighten this hardware. You may
need to open the latch to access the screw holes
for mounting.
G16
G14
G15
The wall bracket should be installed to a sturdy, reinforced surface e.g. concrete wall, brick
wall, drywall with wooden studs. The wall bracket is designed to work with standard 16” stud
spacing. This template indicates the proper drill holes and the full, assembled size of the wall
bracket.
Wall Bracket Template
.5"
13 mm
.5"
13 mm
16"
406 mm
8"
203 mm
8"
203 mm
4"
102 mm
4"
102 mm
Supercell Wall Bracket Template
#ZBT040001
Drill Here
Drill Here
Drill Here
Drill Here
LEVEL THIS LINE
The Cyclone can be rotated in 90-degree increments so that the inlet is facing parallel or
perpendicular to the wall. Decide how you want your system oriented during installation to
best meet your shop’s needs. Other positions will not work as they will hinder installation of
the Rear Support Brace.
Cyclone Mounting Positions
RIGHT
FORWARD
LEFT
3
Identify where you will install the Supercell
in your shop. It must mount to a reinforced
wall (studs, concrete, etc.) and is designed to
accommodate standard 16" stud spacing.
Center the wall bracket Template (G1)
between your wall studs [FIG. 3].
FIG. 3
16"
406 mm
G1
The wall bracket should be installed to a sturdy, reinforced surface e.g. concrete wall, brick
wall, drywall with wooden studs. The wall bracket is designed to work with standard 16” stud
spacing. This template indicates the proper drill holes and the full, assembled size of the wall
bracket.
Wall Bracket Template
.5"
13 mm
.5"
13 mm
16"
406 mm
8"
203 mm
8"
203 mm
4"
102 mm
4"
102 mm
Supercell Wall Bracket Template
#ZBT040001
Drill Here
Drill Here
Drill Here
Drill Here
LEVEL THIS LINE
The Cyclone can be rotated in 90-degree increments so that the inlet is facing parallel or
perpendicular to the wall. Decide how you want your system oriented during installation to
best meet your shop’s needs. Other positions will not work as they will hinder installation of
the Rear Support Brace.
Cyclone Mounting Positions
RIGHT
FORWARD
LEFT
4
Mark a straight level line 26-5/8" from the
ground. Align the top of the Template (G1)
with the marked line [FIG. 4] and temporarily
secure the Template (G1) to the wall with a
tack or non-marking tape.
FIG. 4
26-5/8"
676 mm
G1
Summary of Contents for Supercell XSK000014
Page 2: ......
Page 31: ...oneida air com 29 Notes...