iii
Procedure from installation to operation
Start
Installation/connection
Preparation for operation
Maintenance/
inspection
Yes
No
No
Yes
Read “Safety precautions”
Page v
Remove the product from the
package and check the contents
Page 1
Perform installation and
connection Page 5
Check the operation and
displays Pages 15
Charge the battery
Page 17
Measure the backup time
Page 35
Read “Using the UPS
monitoring software and
contact signal” Page 43
Operate Page 18
Deteriorated
battery?
Perform maintenance
and inspection Page 37
Replace the battery
Page 38
Are you
using UPS monitoring
software or contact
signal?
Charge the battery again
Page 17
* Preparation for operation is
complete.