2
.Installation and connection
11
(3) For EIA standard-compliant installation, use the 8 included EIA rack fixing nuts (M5) and 8
EIA/JIS rack fixing screws (M5) to securely fasten the front (the side displaying “L” or “R”)
and the back of the support angles to the server rack.
③
The screw holes are located at the
top and bottom for both front and rear.
For JIS standards, use a total of 6 included screws to fix the rack; 1 JIS rack fixing flat-head
screw (M5) at a front position of the each of right and left support angles, 2 EIA/JIS rack fix-
ing screws (M5) at 2 rear positions.
③
The screw hole position for the front is at the second
screw hole from the top, the rear is at the second screw hole from the bottom.
(4) Use the 8 included ear bracket mounting flat-head screws (2 sets of 4 screws) to securely
fasten the ear brackets to the left and right sides of the UPS.
④
The support angles cannot be attached to special EIA/JIS racks.
(2) Adjust the length of support angles to suit the server rack, and then securely tighten the
screws that were half-tightened in step 1.
②
3
2
2
3
Rack fixing screws
Adjust the length to
suit the server rack
and tighten securely.
④
④
Summary of Contents for BU1002RW
Page 64: ...10 52 Notes of Chinese 10 UPS UPS 1 FA OA Windows UPS...
Page 65: ...10 Notes of Chinese 53 2 FA OA 2...
Page 66: ...BU1002RW 10 54 AC 50 60Hz AC AC AC AC...
Page 67: ...10 Notes of Chinese 55 5cm 10cm UPS UPS AC AC AC200V 240V AC200 240V...
Page 68: ...BU1002RW 10 56 AC AC AC AC AC ON OFF AC INPUT PROTECTION 25 5 2 5 35 3 5mA...
Page 69: ...10 Notes of Chinese 57 AC UPS AC UPS...
Page 70: ...BU1002RW 10 58 AC AC 50 60Hz 25 25 6 40 2 AC AC...
Page 71: ...10 Notes of Chinese 59 DC250V UPS 200V http www fa omron com cn Pb AC AC 50 60Hz...