EN
34
Electronic version
Pinout of the sensor connector:
Fuel Tank Calibration
Fuel tank calibration is necessary to verify the compliance of the
Omnicomm LLS-Ex 5 sensor’s digital code and the amount of fuel in
a particular fuel tank.
Fuel tank calibration consists in filling the tank with fuel, from
empty to full, following a certain refueling step and recording
the Omnicomm LLS sensor’s readings in the calibration table. It is
recommended to carry out at least 20 steps. It is possible to calibrate
the tank by draining it.
Sealing
Place the casing-seal on the body of the sensor:
• Place the pins and push them in as far as possible (Figure 6)
Figure 5. Connector of the Omnicomm LLS-Ex 5 sensor
RS-485 A
RS-485 B
+V Power
Ground
Not Used
Not Used
Summary of Contents for LLS-Ex 5
Page 42: ...РЕДАКЦИЯ 26 10 2021 EDITION ...