EN
26
Electronic version
Assembly Instructions
Installation works should be carried out using fully operational tools
and complying with the safety requirements.
The list and order of execution of all necessary actions for the
installation of the product:
1. Preparation to Installation into a Fuel Tank
2. Cut of the Sensor for a Specific Fuel Tank
3. Product Set Up via Omnicomm Configurator
4. Installation and Connection
5. Fuel Tank Calibration
6. Sealing
Preparation to Installation into a Fuel Tank
1. Select a location for Omnicomm LLS-Ex 5 sensor installation, that
meets the following requirements:
• Installation location should be as close as possible to the
geometric center and placed at the deepest level of the tank
(Figure 1)
Figure 1. Selection of Omnicomm LLS-Ex 5 sensor installation place
Summary of Contents for LLS-Ex 5
Page 42: ...РЕДАКЦИЯ 26 10 2021 EDITION ...