60
13.4 Piping Leak
Description:
There is leakage on the steel piping.
Possible causes, inspection and fixing procedure:
The leakage on steel piping most frequently occurs after initial commissioning,
decommissioning and re-commissioning or after extensive maintenance that puts a strain
on fittings and piping.
1.
Leakage at initial commissioning
: All B-DRY adsorption dryers are tested for leakage
as well as mechanical and electrical errors prior to packaging and shipping. Please
review the transportation, handling and installation procedures. The steel piping can
be replaced with standard readily available piping and fittings. Consult with the dryer
supplier for technical support.
2.
Leakage after decommissioning and commissioning or extensive maintenance
:
Review the procedures. The steel piping can be replaced with standard readily
available piping and fittings. Consult with dryer supplier for technical support.
14 Warranty Exclusion
The guarantee shall be void if:
1.
The operating instructions were not followed with respect to initial commissioning and
maintenance.
2.
The unit was not operated properly and appropriately.
3.
The unit was operated when it was clearly defective.
4.
Non-original spare parts or replacement parts were used.
5.
The unit was not operated within the permissible technical parameters.
6.
Unauthorised constructional changes were made to the unit or if parts of the unit that
may not be opened were dismantled.
Summary of Contents for B-DRY Series
Page 2: ...2...
Page 15: ...15...
Page 31: ...31 5 10 Electrical Scheme Sensor Connection...
Page 35: ...35...
Page 37: ...37 Enter the password and you will get access to the controller interface...
Page 61: ...61 15 Maintenance Record TYPE OF MAINTENANCE DATE SIGNATURE NOTES Commissioned...
Page 62: ...62...
Page 63: ...63...
Page 64: ...64...