46
10.2 Opening Outlet Valve
Opening of the outlet valve should be done extremely slowly especially when the system
downstream of the valve is not pressurized.
Follow the procedure:
•
Make certain that the adsorption dryer is not in operation, the circuit breaker and the
controller should be turned off.
•
Open the outlet valve slightly until you hear first flow noise.
•
Wait until you no longer hear flow noise.
•
Fully open the outlet valve.
10.3 Start-up
After the installation, pressurization and opening of the outlet valve procedures are
completed the start-up procedure can be initiated.
Follow the start-up procedure:
•
Visually re-check the installation.
•
Make certain that the inlet valve is opened.
•
Check the manometers to make certain that both towers are pressurized.
•
Make certain that the outlet valve is opened.
•
Listen for any leaking sound.
•
Turn on the circuit breaker.
•
Turn on the electrical power source (if there is a switch).
CIRCUIT BREAKER
Summary of Contents for B-DRY Series
Page 2: ...2...
Page 15: ...15...
Page 31: ...31 5 10 Electrical Scheme Sensor Connection...
Page 35: ...35...
Page 37: ...37 Enter the password and you will get access to the controller interface...
Page 61: ...61 15 Maintenance Record TYPE OF MAINTENANCE DATE SIGNATURE NOTES Commissioned...
Page 62: ...62...
Page 63: ...63...
Page 64: ...64...