Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 10
Note:
The floor will be flipped over and floor
runners will sit on your foundation. It is
important to note that having a level foundation
is critical. Choosing a foundation will vary
between regions. Typical foundations can be
concrete pads or patio stones positioned
underneath the floor runners.
Concrete Slab
Foundation
Foundations
5.
Attach
Floor Runners
to
Floor Frames
with
13 - 2 1/2” screws
per completed runner length (
39
Total
). For
Wide Floor Runner
use 4 screws in the 56” pieces and 5 screws in the 70” piece. For the
3 1/2”
Floor Runner
use 5 screws for the 72” pieces and 3 screws for the 38” pieces.
6.
With some helpers, flip the floor section over so it rests on your foundation.
Wide Floor Runner
should rest in the center of your foundation.
Caution:
you will need 2 people to assist you. Be careful
when laying floor down not to bend or twist floor. When in place, level floor completely.
Wide Floor
Runner
7.
Lay out Remaining
Floor Runners
on second floor frames ( 4x 72” Runners and 2x 38” Runners).
Attach reamining runners with a total of
26 - 2 1/2” screws
as per
Step 5
.