2.
When correctly positioned, attach each Joist with
4 - 2 1/2”
screws (2 per end).
Complete all Floor Frame and Joist connections.
You can find the Square Drive Bit for the screws
in with the Hardware Kit Bag.
You can find the
Square Drive Bit
for the screws in
with the Hardware
Kit Bag.
4.
Locate
Floor Runners
and
Wide Floor
Runners
. Lay out
Floor Runners
above
Completed Floor Frame
section as shown
above. The
3 1/2” wide Floor Runner
should be
flush with the edge of the floor frame.
5 1/2” wide
Floor Runner
should overhang the edge of the
floor Frame by 2 3/4”. Third set of Floor Runners
should be centered on Floor Frame.
Parts (Steps 4 - 9)
Wide Floor Runners
(1 1/2” x 5 1/2” x 56”)
x 2
Wide Floor Runner
(1 1/2” x 5 1/2” x 70”)
x 1
Floor Runners
(1 1/2” x 3 1/2” x 38”)
x 4
Floor Runner
(1 1/2” x 3 1/2” x 72”)
x 8
Hardware (Steps 4 - 9)
S1
- 2 1/2” Screws
x 116
total
3.
Lay out
75” Floor Frames
as shown above. Attach each completed frame to the next with
8 - 2
1/2” screws
(24 Total). Once complete assemble 66 1/2” Floor Frames the same way.
Flush
Overhanging
5 1/2”
2 3/4”